08‑28‑2018 | Chelan PUD email notice regarding 2018 Chelan River Hourly and Daily Average Temperature Report for the month of July: Article 405(a) | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
07‑25‑2018 | Chelan PUD email notice regarding 2018 Chelan River Hourly and Daily Average Temperature Report for 2nd Quarter: Article 405(a) | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
07‑25‑2018 | Chelan PUD email notice regarding 2018 Chelan River Hourly and Daily Average Flow Report for 2nd Quarter: Article 405(a) | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
04‑30‑2018 | Chelan PUD electronic filing of Article 405, Article 408, Appendix D - 2017 Annual Flow and Water Temperature Report, including the Water Quality Assessment | Federal Energy Regulatory Commission | Chelan PUD |
04‑30‑2018 | Chelan PUD electronic filing of Article 403, Stehekin Area Implementation Monitoring Plan, 2017 Annual Report and 2018 Work Plan | Federal Energy Regulatory Commission | Chelan PUD |
03‑30‑2018 | Notification of Temporary Change in Chelan River and Pumped Flow for Low Level Outlet Flow Meter Recalibration | Federal Energy Regulatory Commission | Chelan PUD |
03‑20‑2018 | Chelan PUD email requesting comments on the Draft 2017 Lake Chelan Annual Flow and Water Temperature Report: Articles 405a and 408, Appendix D 401 Water Quality Certification | Forum, Chelan River Fishery and Multi agencies | Chelan PUD |
02‑23‑2018 | Chelan PUD email requesting comments on the Draft 2013-2017 Wildlife Habitat Summary Report and Draft 2018-2022 Wildlife Habitat Plan: Article 406. | Forum, Lake Chelan Wildlife | Chelan PUD |
01‑31‑2018 | Submittal of the Monitoring the Stehekin River Channel results to Jon Riedel, National Park Service: Section 6.3 of Chapter 4 | National Park Service | Chelan PUD |
01‑29‑2018 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Data Reports for 4th Quarter: Article 405(a) | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
01‑25‑2018 | FERC order revising reporting schedule for riparian zone plan: Article 403 | Chelan PUD | Federal Energy Regulatory Commission |
01‑23‑2018 | Issued FERC order amending minimum instream flow table. | Chelan PUD | Federal Energy Regulatory Commission |
01‑12‑2018 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Flow Report for 4th Quarter: Article 405(a). | Forum Chelan River Fishery and Multi Agencies | Chelan PUD |
12‑22‑2017 | Chelan PUD request for time extension for 2017 Technical Report and Revised Schedule for Future Reports: Article 403(d). | Federal Energy Regulatory Commission | Chelan PUD |
12‑15‑2017 | Chelan PUD correction request that the footnotes to Table 1 Minimum Instream Flow Requirement for the Chelan River in the Order to be corrected. | Federal Energy Regulatory Commission | Chelan PUD |
12‑07‑2017 | Issued FERC order amending minimum pumped spawning flow and related License requirements: Article 405, Article 408, Appendix A and Appendix D. | Chelan PUD | Federal Energy Regulatory Commissin |
12‑01‑2017 | Chelan PUD email notice regarding amending minimum total flow for Chinook salmon and steelhead spawning in the Chelan River Habitat Channel. | Forum, Chelan River Fishery | Chelan PUD |
11‑29‑2017 | Chelan PUD submitted request to amend Chelan River Habitat Channel minimum pumped spawing flow requirement: Article 405 and Article 408 and Appendix A | Federal Energy Regulatory Commission | Chelan PUD |
11‑03‑2017 | Issued Amend Order #15481 to Amend Order #1233 dated June 1, 2004. This allow and provide a minimum total flow of 260 cfs instead of a minimum toatl flow of 320 cfs, the equivalent of using four pumps vs. five pumps. | Chelan PUD | Washington State Department of Ecology |
10‑31‑2017 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Data Reports for 3rd Quarter and September: Article 405(a) | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
10‑31‑2017 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Flow Report for 3rd Quarter: Article 405(a) | Form, Chelan River Fishery and Multi Agencies | Chelan PUD |
10‑02‑2017 | FERC acknowledges receipt of Chelan PUD's letter filed September 18, 2017 regarding a four-pump operation for the fall 2017 Chinook salmon spawning period; Article 408, Appendix D Water Quality Cerfification Condition IV.E. | Chelan PUD | Federal Energy Regulatory Commission |
09‑29‑2017 | Chelan PUD email notice regarding Chelan River Hourly and Daily Average Temperature Report for the month of August: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
09‑27‑2017 | Email notification regarding letter to the Federal Regulatory Commission regarding the temporary pumped flow change to the Chelan River Habitat Channel for fall 2017. | Washington State Department of Ecology | Chelan PUD |
09‑25‑2017 | Chelan PUD email notification regarding a temporary four-pump operation for the Fall 2017 Chinook salmon spawning period. | Forum, Chelan River Fishery | Chelan PUD |
09‑18‑2017 | Notification of temporary change in pumped flow to Chelan River Habitat Channel for Fall 2017: Article 405, Article 408, Appendix D Water Quality Certification Condition III. | Federal Energy Regulatory Commission | Chelan PUD |
08‑30‑2017 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Report for the month of July: Article 405(a). | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
07‑31‑2017 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Report for 2nd Quarter: Article 405(a). | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
07‑25‑2017 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Flow Data Report: Article 405(a). | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
05‑11‑2017 | Notification of temporary change in flow operations to implement Chelan River Steelhead Trout Egg to Emergence Survival Study: Article 405, Article 408, Appendix A, and Appendix D. | Federal Energy Regulatory Commission | Chelan PUD |
05‑08‑2017 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Data Report: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
04‑27‑2017 | Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Temperature Data: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
04‑27‑2017 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Data: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
04‑27‑2017 | Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Flow Data: Article 405(a) | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
03‑30‑2017 | Chelan PUD email notice of the 30-day review and comment period ending for the Chelan River Snorkel Survey Report, Chelan River Biological Objectives 207 Status Rreport, and Macroinvertebrate Investigation. | Forum, Chelan River, and Multi Agencies | Chelan PUD |
03‑24‑2017 | Chelan River Steelhead Trout Egg to Emergence Survival Study implementation: Article 405, Article 408, Appendix A, and Appendix D. | Agencies, multi | Chelan PUD |
03‑23‑2017 | Chelan PUD request to temporary change Chelan River pump flow to conduct Steelhead and Trout Egg to Emergence Survival Study: Article 405, Article 408, Appendix A, and Appendix D. | Federal Energy Regulatory Commission | Chelan PUD |
03‑22‑2017 | Chelan PUD notification regarding a schedule reduced flow in Chelan River Habitat Channel to implement Chelan River Steelhead Egg to Emergence Survival Study: Article 405, Article 408, Appendix A, and Appendix D. | Forum, Chelan River Fishery | Chelan PUD |
03‑21‑2017 | Schedule and request for Statement of Concurrence regarding reduced flow operations to implement Chelan River Steelhead Trout Egg to Emergence Survival Study | Forum, Chelan River Fishery and Other Parties | Chelan PUD |
03‑21‑2017 | Chelan PUD email regarding reduced flow operations to implement Chelan River Steelhead Trout Egg to Emergence Survival Study: Article 405, Article 408, Appendix A, and Appendix D. | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
03‑13‑2017 | Request to amend minimum pumped spawning flow requirement to the Chelan River Habitat Channel. Article 405, Article 408 and Appendix A. | Federal Energy Regulatory Commission | Chelan PUD |
02‑28‑2017 | Chelan PUD email requesting comments, 30-day period, on the 2017 Bological Objections Status Report: Article 408, Appendix D and Settlement Agreement 7(c)(2). | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
02‑24‑2017 | Chelan PUD email requesting comments on the 2016 Chelan River Snorkel Surveys-DRAFT Annual Report: Article 405, Article 408, Appendix D. | Forum, Chelan River and multi Agencies | Chelan PUD |
02‑16‑2017 | Chelan PUD request for time extension to file the 2016 Annual Flow and Water Temperature Report: Article 405, Article 408, and Appendix D of the License | Federal Energy Regulatory Commission | Chelan PUD |
02‑08‑2017 | Chelan PUD submittal of Chelan River minimum instream flow deviation report for December 5, 2016 incident. | Federal Energy Regulatory Commission | Chelan PUD |
02‑07‑2017 | Washington Department of Fish and Wildlife support amending spawning flow to the Chelan River Habitat Channel. | Chelan PUD | Washington Department of Fish and Wildlife |
02‑02‑2017 | Chelan PUD request for amending spawning flow to the Chelan River Habitat Channel: Article 405, Article 408, Settlement Agreement Attachment B, Chapter 7, and 401 Water Quality Certification. | Forum, Chelan River Fishery | Chelan PUD |
01‑31‑2017 | Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Temperature Report for 4th Quarter (Low Level Outlet only): Article 405(a) | Forum, Chelan River Fishery and Multi Agencies | Chelan PUD |
01‑31‑2017 | Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Flow Data Report for 4th Quarter: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
12‑08‑2016 | FERC acknowledges receipt of Chelan PUD's letter filed October 13, 2016 regarding temporary change in pumped flow to the Chelan River habitat channel: Article 405, 408 and Appendix D. | Chelan PUD | Federal Energy Regulatory Commission |
11‑29‑2016 | Chelan PUD notice regarding Federal Energy Regulatory Commission submittal of the Revised Form 80. | Forum, Lake Chelan Recreation | Chelan PUD |
11‑22‑2016 | Chelan PUD email regarding Chelan River operations; pump station operation (4 pumps versus 5) and ramping rates for pump station shut-down. | Forum, Chelan River Fishery | Chelan PUD |
10‑13‑2016 | Chelan PUD letter notice regarding a four-pump operation for the fall 2016 Chinook salmon spawning period: Article 408, Appendix D Water Quality Certification Condition IV.E. | Federal Energy Regulatory Commission | Chelan PUD |
09‑09‑2016 | Chelan PUD email notice regarding Chelan River Hourly and Daily Average Flow Data for August: Article 405(a). | Forum, Chelan River and multi Agencies | Chelan PUD |
09‑06‑2016 | Chelan PUD email notice regarding Chelan River UPDATED Hourly and Daily Average temperature Report for 1st Quarter, 2nd Quarter and July: Article 405(a). | Forum, Chelan River and multi Agencies | Chelan PUD |
08‑30‑2016 | Chelan PUD email notice regarding Chelan River Houlry and Daily Average Flow Data for July: Article 405(a). | Forum, Chelan River and multi Agencies | Chelan PUD |
08‑29‑2016 | Chelan PUD email notice regarding Chelan River Hourly and Daily Average Temperature Report for July and August: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
08‑16‑2016 | Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Temperature Report for 1st Quarter Update and 2nd Quarter: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
08‑15‑2016 | Chelan PUD email notice regarding Chelan River Hourly and Daily Average Flow Data for 2nd Quarter: Article 405(a). | Forum, Chelan River and multi Agencies | Chelan PUD |
05‑19‑2016 | Chelan PUD email update regarding spill operations in the Chelan River: Article 405(a). | Forum, Chelan River Fishery | Chelan PUD |
05‑16‑2016 | Chelan PUD email update regarding spill operations in the Chelan River: Article 405(a). | Forum, Chelan River Fishery | Chelan PUD |
05‑13‑2016 | Chelan PUD email update regarding flows in the Chelan River: Article 405(a). | Forum, Chelan River Fishery | Chelan PUD |
05‑10‑2016 | Chelan PUD email requesting comments on the DRAFT 2015 Lake Chelan Annual Flow and Water Temperature Report: Article 405 and 408. | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
05‑04‑2016 | FERC's Order Granting Extension of Time to file the 2015 Annual Flow and Water Temperature Report: Article 405 and Article 408. | Chelan PUD | Federal Energy Regulatory Commission. |
05‑04‑2016 | Chelan PUD email notice regarding the initiation of spill to 9,000 cfs in the Chelan River: Article 405(a). | Forum, Chelan River Fishery and Federal Energy Regulatory Commission | Chelan PUD |
04‑28‑2016 | Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Temperature Report for 1st Quarter: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
04‑27‑2016 | Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Flow Data Report for 1st Quarter: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
04‑25‑2016 | Chelan PUD request for time extension to file the 2015 Annual Flow and Water Temperature Report: Article 405, Article 408 and Appendix of the License. | Federal Energy Regulatory Commission | Chelan PUD |
04‑22‑2016 | Chelan PUD email requesting comments on the draft Chelan River Temperature Model Calibration and Initial Results: Article 405, Article 408. | Forum, Chelan River Fishery | Chelan PUD |
04‑22‑2016 | Chelan PUD email requesting comments on the DRAFT Chelan River Temperature Model Calibration and Initial Results: Article 405 and 408. | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
04‑07‑2016 | Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Data Report for 4th Quarter: Article 405(a). | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
03‑11‑2016 | Chelan PUD letter notice regarding a temporary change in flow to the Chelan River habitat channel by operating four rather five pumps during the March 15 through May 15, 2016 period: Article 408, Appendix D Water Quality Certification Condition IV.E. | Federal Energy Regulatory Commission | Chelan PUD |
02‑01‑2016 | Chelan PUD email requesting final comments regarding 2015 Lake Chelan Annual Lake Level Report: Article 405(b). | Washington State Department of Ecology and multi Agencies | Chelan PUD |
01‑29‑2016 | Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Flow Data Report for 4th Quarter: Article 405a. | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
10‑30‑2015 | Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Flow Data Report for 3rd Quarter: Article 405a. | Forum, Chelan River Fishery, and multi Agencies | Chelan PUD |
10‑30‑2015 | Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Data Report, 3rd Quarter: Appendix D 401 Water Certification Condition V.C.i. | Forum, Chelan River Fishery, and multi Agencies | Chelan PUD |
10‑27‑2015 | Chelan PUD application for Municipal exemption from annual charges for Lake Chelan Hydroelectric Project, FERC No. 637. | Federal Energy Regulatory Commission | Chelan PUD |
09‑30‑2015 | Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Monitoring Data, July - August: Appendix D 401 Water Quality Certification Condition V.C.i. | Forum, Chelan River Fishery, and multi Agencies | Chelan PUD |
08‑21‑2015 | Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Monitoring Data-July: Appendix D 401 Water Quality Certification Condition V.C.i. | Forum, Chelan River Fishery, and multi Agencies | Chelan PUD |
06‑02‑2015 | Chelan PUD email notification regarding Chelan River pump station operation for moderating Chelan River Habitat Channel water temperatures recommended by Chelan River Fishery Forum. | Federal Energy Regulatory Commission | Chelan PUD |
04‑30‑2015 | Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Flow Data for 1st Quarter: Article 405a. | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
04‑30‑2015 | Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Monitoring Data-1st Quarter Reports: Appendix D 401 Water Quality Certification Condition V.C.i. | Forum, Chelan River Fishery, and multi Agencies | Chelan PUD |
04‑15‑2015 | Chelan PUD email requesting comments on the draft Revised Quality Assurance Project Plan for the Chelan River Temperature Model, License Article 401 and Water Certification Condition V.B. | Washington State Department of Ecology | Chelan PUD |
04‑03‑2015 | Chelan PUD email requesting comments on the draft Chelan River Three-year Whitewater Boating Monitoring Report 2012-2014, Article 407. | American Whitewater, Thomas O'Keefe | Chelan PUD |
04‑02‑2015 | Chelan PUD issuance of Final 2015 Lake Chelan Fishery Annual Work Plan. | Forum, Lake Chelan Fishery | Chelan PUD |
03‑25‑2015 | Chelan PUD email regarding Lake Chelan Funding Provisions Annual Statement update per Settlement Agreement, Section 19.3 and 19.4. | Agencies, multi | Chelan PUD |
03‑24‑2015 | Comments received on the 2015 Lake Chelan Fishery Annual Work Plan: Article 404. | Chelan PUD | National Park Service |
03‑23‑2015 | Chelan PUD email requesting final review on the 2015 Lake Chelan Fishery Annual Work Plan: Article 404. | Forum, Lake Chelan Fishery | Chelan PUD |
03‑16‑2015 | Chelan PUD email requesting comments on the draft 2014 Lake Chelan Annual Flow and Temperature Report, Article 405a and 408, Appendix D 401 Water Quality Certification Condition V.C.i. | Forum, Chelan River Fishery and multi Agencies | Chelan PUD |
03‑16‑2015 | Chelan PUD email requesting comments on the REVISED Water Monitoring Quality Assurance Project Plan, Article 401. | Washington State Department of Ecology | Chelan PUD |
03‑16‑2015 | Chelan PUD email requesting comments on the 2015 Chelan River Biological Objectives Status Report, Article 408. | Forum, Chelan River Fishery | Chelan PUD |
03‑13‑2015 | Chelan PUD notification of temporary changes in pumped flow to Chelan River Habitat Channel for 2014 and 2015, License Article 408, Appendix D Water Quality Certification Condition I.V.E and Settlement Agreement Article 7(c)(2). | Federal Energy Regulatory Commission, Washington State Department of Ecology and Forum, Chelan River Fishery | Chelan PUD |
03‑09‑2015 | Comments received regarding the 2015 Lake Chelan Fishery Annual Work Plan: Article 404. | Chelan PUD | National Parks Service |
03‑09‑2015 | Comments received regarding the 2015 Lake Chelan Fishery Annual Work Plan: Article 404. | Chelan PUD | Washington Department of Fish and Wildlife Services |
03‑07‑2015 | Comments received regarding the 2015 Lake Chelan Fishery Annual Work Plan: Article 404. | Chelan PUD | Washington State Department of Fish and Wildlife Services |
03‑06‑2015 | Comments received on the 2015 Lake Chelan Fishery Annual Work Plan: Article 404. | Chelan PUD | U.S. Fish and Wildlife Service |
03‑05‑2015 | Comments requested on the 2015 Lake Chelan Fishery Annual Work Plan: Article 404. | Agencies, multi | Washington State Department of Fish and Wildlife Services |
03‑02‑2015 | Email regarding the DRAFT 2015 Lake Chelan Fishery Annual Work Plan. | Chelan PUD | Washington State Department of Fish and Wildlife Services |
01‑21‑2015 | Chelan PUD email regarding the 30-day review period requesting comments on the DRAFT 2015 Annual Fish Stocking Report: Article 404. | Forum, Lake Chelan Fishery | Chelan PUD |
01‑12‑2015 | Chelan PUD email requesting comments on the 2014 Lake Chelan Annual Lake Level Report: Article 405b. | Forum, Chelan Rivery Fishery | Chelan PUD |