Correspondence

Datenot sorted, click to sort ascendingDocumentnot sorted, click to sort ascendingTonot sorted, click to sort ascendingFromnot sorted, click to sort ascending
10‑02‑2017 FERC acknowledges receipt of Chelan PUD's letter filed September 18, 2017 regarding a four-pump operation for the fall 2017 Chinook salmon spawning period; Article 408, Appendix D Water Quality Cerfification Condition IV.E.Chelan PUDFederal Energy Regulatory Commission
09‑29‑2017 Chelan PUD email notice regarding Chelan River Hourly and Daily Average Temperature Report for the month of August: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
09‑25‑2017 Chelan PUD email notification regarding a temporary four-pump operation for the Fall 2017 Chinook salmon spawning period.Forum, Chelan River FisheryChelan PUD
09‑18‑2017 Notification of temporary change in pumped flow to Chelan River Habitat Channel for Fall 2017: Article 405, Article 408, Appendix D Water Quality Certification Condition III.Federal Energy Regulatory CommissionChelan PUD
08‑30‑2017 Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Report for the month of July: Article 405(a).Forum, Chelan River Fishery and Multi AgenciesChelan PUD
07‑31‑2017 Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Report for 2nd Quarter: Article 405(a).Forum, Chelan River Fishery and Multi AgenciesChelan PUD
07‑25‑2017 Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Flow Data Report: Article 405(a).Forum, Chelan River Fishery and Multi AgenciesChelan PUD
05‑11‑2017 Notification of temporary change in flow operations to implement Chelan River Steelhead Trout Egg to Emergence Survival Study: Article 405, Article 408, Appendix A, and Appendix D.Federal Energy Regulatory CommissionChelan PUD
05‑08‑2017 Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Data Report: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
04‑27‑2017 Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Temperature Data: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
04‑27‑2017 Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Temperature Data: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
04‑27‑2017 Chelan PUD email notice regarding 2017 Chelan River Hourly and Daily Average Flow Data: Article 405(a)Forum, Chelan River Fishery and multi AgenciesChelan PUD
03‑30‑2017 Chelan PUD email notice of the 30-day review and comment period ending for the Chelan River Snorkel Survey Report, Chelan River Biological Objectives 207 Status Rreport, and Macroinvertebrate Investigation.Forum, Chelan River, and Multi AgenciesChelan PUD
03‑24‑2017 Chelan River Steelhead Trout Egg to Emergence Survival Study implementation: Article 405, Article 408, Appendix A, and Appendix D.Agencies, multiChelan PUD
03‑23‑2017 Chelan PUD request to temporary change Chelan River pump flow to conduct Steelhead and Trout Egg to Emergence Survival Study: Article 405, Article 408, Appendix A, and Appendix D.Federal Energy Regulatory CommissionChelan PUD
03‑22‑2017 Chelan PUD notification regarding a schedule reduced flow in Chelan River Habitat Channel to implement Chelan River Steelhead Egg to Emergence Survival Study: Article 405, Article 408, Appendix A, and Appendix D.Forum, Chelan River FisheryChelan PUD
03‑21‑2017 Chelan PUD email regarding reduced flow operations to implement Chelan River Steelhead Trout Egg to Emergence Survival Study: Article 405, Article 408, Appendix A, and Appendix D.Forum, Chelan River Fishery and multi AgenciesChelan PUD
03‑21‑2017 Schedule and request for Statement of Concurrence regarding reduced flow operations to implement Chelan River Steelhead Trout Egg to Emergence Survival StudyForum, Chelan River Fishery and Other PartiesChelan PUD
02‑28‑2017 Chelan PUD email requesting comments, 30-day period, on the 2017 Bological Objections Status Report: Article 408, Appendix D and Settlement Agreement 7(c)(2).Forum, Chelan River Fishery and Multi AgenciesChelan PUD
02‑24‑2017 Chelan PUD email requesting comments on the 2016 Chelan River Snorkel Surveys-DRAFT Annual Report: Article 405, Article 408, Appendix D.Forum, Chelan River and multi AgenciesChelan PUD
02‑16‑2017 Chelan PUD request for time extension to file the 2016 Annual Flow and Water Temperature Report: Article 405, Article 408, and Appendix D of the LicenseFederal Energy Regulatory CommissionChelan PUD
02‑08‑2017 Chelan PUD submittal of Chelan River minimum instream flow deviation report for December 5, 2016 incident.Federal Energy Regulatory CommissionChelan PUD
02‑07‑2017 Washington Department of Fish and Wildlife support amending spawning flow to the Chelan River Habitat Channel.Chelan PUDWashington Department of Fish and Wildlife
02‑02‑2017 Chelan PUD request for amending spawning flow to the Chelan River Habitat Channel: Article 405, Article 408, Settlement Agreement Attachment B, Chapter 7, and 401 Water Quality Certification.Forum, Chelan River FisheryChelan PUD
01‑31‑2017 Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Temperature Report for 4th Quarter (Low Level Outlet only): Article 405(a)Forum, Chelan River Fishery and Multi AgenciesChelan PUD
01‑31‑2017 Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Flow Data Report for 4th Quarter: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
12‑08‑2016 FERC acknowledges receipt of Chelan PUD's letter filed October 13, 2016 regarding temporary change in pumped flow to the Chelan River habitat channel: Article 405, 408 and Appendix D.Chelan PUDFederal Energy Regulatory Commission
11‑29‑2016 Chelan PUD notice regarding Federal Energy Regulatory Commission submittal of the Revised Form 80.Forum, Lake Chelan RecreationChelan PUD
11‑22‑2016 Chelan PUD email regarding Chelan River operations; pump station operation (4 pumps versus 5) and ramping rates for pump station shut-down.Forum, Chelan River FisheryChelan PUD
10‑13‑2016 Chelan PUD letter notice regarding a four-pump operation for the fall 2016 Chinook salmon spawning period: Article 408, Appendix D Water Quality Certification Condition IV.E.Federal Energy Regulatory CommissionChelan PUD
09‑09‑2016 Chelan PUD email notice regarding Chelan River Hourly and Daily Average Flow Data for August: Article 405(a).Forum, Chelan River and multi AgenciesChelan PUD
09‑06‑2016 Chelan PUD email notice regarding Chelan River UPDATED Hourly and Daily Average temperature Report for 1st Quarter, 2nd Quarter and July: Article 405(a).Forum, Chelan River and multi AgenciesChelan PUD
08‑30‑2016 Chelan PUD email notice regarding Chelan River Houlry and Daily Average Flow Data for July: Article 405(a).Forum, Chelan River and multi AgenciesChelan PUD
08‑29‑2016 Chelan PUD email notice regarding Chelan River Hourly and Daily Average Temperature Report for July and August: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
08‑16‑2016 Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Temperature Report for 1st Quarter Update and 2nd Quarter: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
08‑15‑2016 Chelan PUD email notice regarding Chelan River Hourly and Daily Average Flow Data for 2nd Quarter: Article 405(a).Forum, Chelan River and multi AgenciesChelan PUD
05‑19‑2016 Chelan PUD email update regarding spill operations in the Chelan River: Article 405(a).Forum, Chelan River FisheryChelan PUD
05‑16‑2016 Chelan PUD email update regarding spill operations in the Chelan River: Article 405(a).Forum, Chelan River FisheryChelan PUD
05‑13‑2016 Chelan PUD email update regarding flows in the Chelan River: Article 405(a).Forum, Chelan River FisheryChelan PUD
05‑10‑2016 Chelan PUD email requesting comments on the DRAFT 2015 Lake Chelan Annual Flow and Water Temperature Report: Article 405 and 408.Forum, Chelan River Fishery and multi AgenciesChelan PUD
05‑04‑2016 FERC's Order Granting Extension of Time to file the 2015 Annual Flow and Water Temperature Report: Article 405 and Article 408.Chelan PUDFederal Energy Regulatory Commission.
05‑04‑2016 Chelan PUD email notice regarding the initiation of spill to 9,000 cfs in the Chelan River: Article 405(a).Forum, Chelan River Fishery and Federal Energy Regulatory CommissionChelan PUD
04‑28‑2016 Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Temperature Report for 1st Quarter: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
04‑27‑2016 Chelan PUD email notice regarding 2016 Chelan River Hourly and Daily Average Flow Data Report for 1st Quarter: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
04‑25‑2016 Chelan PUD request for time extension to file the 2015 Annual Flow and Water Temperature Report: Article 405, Article 408 and Appendix of the License.Federal Energy Regulatory CommissionChelan PUD
04‑22‑2016 Chelan PUD email requesting comments on the draft Chelan River Temperature Model Calibration and Initial Results: Article 405, Article 408.Forum, Chelan River FisheryChelan PUD
04‑22‑2016 Chelan PUD email requesting comments on the DRAFT Chelan River Temperature Model Calibration and Initial Results: Article 405 and 408.Forum, Chelan River Fishery and multi AgenciesChelan PUD
04‑07‑2016 Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Data Report for 4th Quarter: Article 405(a).Forum, Chelan River Fishery and multi AgenciesChelan PUD
03‑11‑2016 Chelan PUD letter notice regarding a temporary change in flow to the Chelan River habitat channel by operating four rather five pumps during the March 15 through May 15, 2016 period: Article 408, Appendix D Water Quality Certification Condition IV.E.Federal Energy Regulatory CommissionChelan PUD
02‑01‑2016 Chelan PUD email requesting final comments regarding 2015 Lake Chelan Annual Lake Level Report: Article 405(b).Washington State Department of Ecology and multi AgenciesChelan PUD
01‑29‑2016 Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Flow Data Report for 4th Quarter: Article 405a.Forum, Chelan River Fishery and multi AgenciesChelan PUD
10‑30‑2015 Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Flow Data Report for 3rd Quarter: Article 405a.Forum, Chelan River Fishery, and multi AgenciesChelan PUD
10‑30‑2015 Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Data Report, 3rd Quarter: Appendix D 401 Water Certification Condition V.C.i.Forum, Chelan River Fishery, and multi AgenciesChelan PUD
10‑27‑2015 Chelan PUD application for Municipal exemption from annual charges for Lake Chelan Hydroelectric Project, FERC No. 637.Federal Energy Regulatory CommissionChelan PUD
09‑30‑2015 Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Monitoring Data, July - August: Appendix D 401 Water Quality Certification Condition V.C.i.Forum, Chelan River Fishery, and multi AgenciesChelan PUD
08‑21‑2015 Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Monitoring Data-July: Appendix D 401 Water Quality Certification Condition V.C.i.Forum, Chelan River Fishery, and multi AgenciesChelan PUD
06‑02‑2015 Chelan PUD email notification regarding Chelan River pump station operation for moderating Chelan River Habitat Channel water temperatures recommended by Chelan River Fishery Forum.Federal Energy Regulatory CommissionChelan PUD
04‑30‑2015 Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Flow Data for 1st Quarter: Article 405a.Forum, Chelan River Fishery and multi AgenciesChelan PUD
04‑30‑2015 Chelan PUD email notice regarding 2015 Chelan River Daily Average and Hourly Temperature Monitoring Data-1st Quarter Reports: Appendix D 401 Water Quality Certification Condition V.C.i.Forum, Chelan River Fishery, and multi AgenciesChelan PUD
04‑15‑2015 Chelan PUD email requesting comments on the draft Revised Quality Assurance Project Plan for the Chelan River Temperature Model, License Article 401 and Water Certification Condition V.B.Washington State Department of EcologyChelan PUD
04‑03‑2015 Chelan PUD email requesting comments on the draft Chelan River Three-year Whitewater Boating Monitoring Report 2012-2014, Article 407.American Whitewater, Thomas O'KeefeChelan PUD
04‑02‑2015 Chelan PUD issuance of Final 2015 Lake Chelan Fishery Annual Work Plan.Forum, Lake Chelan FisheryChelan PUD
03‑25‑2015 Chelan PUD email regarding Lake Chelan Funding Provisions Annual Statement update per Settlement Agreement, Section 19.3 and 19.4.Agencies, multiChelan PUD
03‑24‑2015 Comments received on the 2015 Lake Chelan Fishery Annual Work Plan: Article 404.Chelan PUDNational Park Service
03‑23‑2015 Chelan PUD email requesting final review on the 2015 Lake Chelan Fishery Annual Work Plan: Article 404.Forum, Lake Chelan FisheryChelan PUD
03‑16‑2015 Chelan PUD email requesting comments on the draft 2014 Lake Chelan Annual Flow and Temperature Report, Article 405a and 408, Appendix D 401 Water Quality Certification Condition V.C.i.Forum, Chelan River Fishery and multi AgenciesChelan PUD
03‑16‑2015 Chelan PUD email requesting comments on the REVISED Water Monitoring Quality Assurance Project Plan, Article 401.Washington State Department of EcologyChelan PUD
03‑16‑2015 Chelan PUD email requesting comments on the 2015 Chelan River Biological Objectives Status Report, Article 408.Forum, Chelan River FisheryChelan PUD
03‑13‑2015 Chelan PUD notification of temporary changes in pumped flow to Chelan River Habitat Channel for 2014 and 2015, License Article 408, Appendix D Water Quality Certification Condition I.V.E and Settlement Agreement Article 7(c)(2).Federal Energy Regulatory Commission, Washington State Department of Ecology and Forum, Chelan River FisheryChelan PUD
03‑09‑2015 Comments received regarding the 2015 Lake Chelan Fishery Annual Work Plan: Article 404.Chelan PUDNational Parks Service
03‑09‑2015 Comments received regarding the 2015 Lake Chelan Fishery Annual Work Plan: Article 404.Chelan PUDWashington Department of Fish and Wildlife Services
03‑07‑2015 Comments received regarding the 2015 Lake Chelan Fishery Annual Work Plan: Article 404.Chelan PUDWashington State Department of Fish and Wildlife Services
03‑06‑2015 Comments received on the 2015 Lake Chelan Fishery Annual Work Plan: Article 404.Chelan PUDU.S. Fish and Wildlife Service
03‑05‑2015 Comments requested on the 2015 Lake Chelan Fishery Annual Work Plan: Article 404.Agencies, multiWashington State Department of Fish and Wildlife Services
03‑02‑2015 Email regarding the DRAFT 2015 Lake Chelan Fishery Annual Work Plan.Chelan PUDWashington State Department of Fish and Wildlife Services
01‑21‑2015 Chelan PUD email regarding the 30-day review period requesting comments on the DRAFT 2015 Annual Fish Stocking Report: Article 404.Forum, Lake Chelan FisheryChelan PUD
01‑12‑2015 Chelan PUD email requesting comments on the 2014 Lake Chelan Annual Lake Level Report: Article 405b.Forum, Chelan Rivery FisheryChelan PUD
12‑15‑2014 2014 season planting from Chelan Hatchery and Chelan Falls.Washington Department of Fish and Wildlife ServicesChelan PUD
12‑11‑2014 Federal Energy Regulatory Commission annual letter regarding the responsibilities that are required to operate a hydroelectric facility.Chelan PUDFederal Energy Regulatory Commission
11‑26‑2014 Handouts from the November 20, 2014 Lake Chelan Fishery Forum meeting.Chelan PUDNational Parks Service
11‑24‑2014 Email notice regarding 2015 fish stocking activities.Chelan PUDWashington State Department of Fish and Wildlife Services
11‑20‑2014 Information regarding actual numbers of fish stocked into Lake Chelan in 2014 and proposed numbers for stocking in 2015.Chelan PUDWashington State Department of Fish and Wildlife Services
10‑14‑2014 Federal Energy Regulatory Commission order revising repporting schedule for Riparian Zone Plan: Article 403.Chelan PUDFederal Energy Regulatory Commission
10‑09‑2014 Public meeting, 14 October 2014, regarding Chelan PUD's reasons to stay with the existing lake level plan based on meetings with the Settlement Agreement parties.Lake Chelan ResidentsChelan PUD
09‑26‑2014 U.S. Fish and Wildlfie Service comments on potential modification to Lake Chelan Lake Level Management Plan and Non-Capacity License Amendment for the Lake Chelan Hydroelectric Project.Chelan PUDU.S. Fish and Wildlife Service
09‑19‑2014 USDA Forest Service comments on potential modification to Lake Chelan Lake Level Management Plan and Non-Capacity License Amendment for the Lake Chelan Hydroelectric Project.Chelan PUDUSDA Forest Service
09‑18‑2014 Washington State Department of Fish & Wildlife comments on potential modification to Lake Chelan Lake Level Management Plan and Non-Capacity License Amendment for the Lake Chelan Hydroelectric Project.Chelan PUDWashington State Department of Fish & Wildlfie
09‑18‑2014 Federal Energy Regulatory Commission order amending the reporting schedule for the Riparian Zone Plan, Article 403.Chelan PUDFederal Energy Regulatory Commission
09‑15‑2014 American Whitewater comments on potential modification to Lake Chelan Lake Level Management Plan and Non-Capacity License Amendment for the Lake Chelan Hydroelectric Project.Chelan PUDAmerican Whitewater
09‑12‑2014 Department of Ecology comments on potential modification to Lake Chelan Lake Level Management Plan and Non-Capacity License Amendment for the Lake Chelan Hydroelectric Project.Chelan PUDDepartment of Ecology
09‑04‑2014 Chelan PUD email notice regarding 2014 Chelan River Daily Average and Hourly Temperature Data for the 2nd Quarter (April-June) and July 2014: Appendix D 401 Water Quality Certification Condition V.C.i.Forum, Chelan River Fishery and multi AgenciesChelan PUD
08‑28‑2014 National Park Service comments on potential modification to Lake Chelan Lake Level Management Plan and Non-Capacity License Amendment for the Lake Chelan Hydroelectric ProjectChelan PUDNational Park Service
08‑26‑2014 FERC's response regarding the report on Chelan River water surface ramping rate deviation that occurred on June 10, 2014, on the Chelan River.Chelan PUDFederal Energy Regulatory Commission
08‑26‑2014 Chelan PUD request for time extension for 2014 Technical Report (Article 403-Riparian Zone Plan) and revised schedule for future reports.Federal Energy Regulatory CommissionChelan PUD
08‑19‑2014 Chelan PUD request for clarification related to Lake Chelan levels: Article 405 - Operations Compliance and Monitoring Plan.Federal Energy Regulatory CommissionChelan PUD
08‑09‑2014 Chelan PUD email regarding pump operations for the Chelan River Habitat Channel.Forum, Chelan River FisheryChelan PUD
07‑24‑2014 Chelan PUD email notice regarding 2014 Chelan River Daily Average and Hourly Flow Data for the 2nd Quarter (April - June): Article 405a.Forum, Chelan River Fishery and multi AgenciesChelan PUD
07‑24‑2014 Chelan PUD email notice regarding the status of the 2014 Chelan River Temperature Monitoring Data - 2nd Quarter Reports: Appendix D 401 Water Quality Certification Condition V.C.i.Forum, Chelan River Fishery and multi AgenciesChelan PUD
07‑11‑2014 Follow-up letter regarding the report on a Chelan River water surface ramping rate deviation that occurred on June 10, 2014 on the Chelan River.Federal Energy Regulatory CommissionChelan PUD
07‑03‑2014 Chelan PUD email regarding 2014 Lake Chelan tributary photographs.Forum, Lake Chelan FisheryChelan PUD
12345