| Title | Code |
|---|---|
|
Asbestos, PCB, Lead Removal & Hazardous Waste Disposal (12 planholders)
Hazardous waste abatement and removal by licensed abatement contractors only.
|
1 |
|
Asphalt Paving & Gravel Surfacing (26 planholders)
All aspects of asphalt paving, preparation, and maintenance, including striping and sweeping.
|
2 |
|
Building and Grounds Maintenance (10 planholders)
Includes window cleaning, waxing, shampooing, janitor, sweeping, pest control and/or feces removal, drain inspection, paved surface maintenance, sport court maintenance, plumbing services, septic pumping, and grease trap cleaning.
|
64 |
|
Building Construction & Remodeling (34 planholders)
Work to include all aspects of new building construction, plus all types of remodel work. For example, inside electrical wiring, plumbing, cabinetry, door/overhead door and window installation, carpet and flooring installation.
|
3 |
|
Commercial Carpet Cleaning (2 planholders)
Labor, equipment, and products necessary to clean carpets.
|
56 |
|
Commercial Laundry Service Provider (1 planholders)
Coveralls, shop towels, floor mats, floor mops and dust towels
|
45 |
|
Concrete & Masonry (37 planholders)
New construction, maintenance and repair work.
|
6 |
|
Crane & Operator (8 planholders)
Services to include both operational usage, plus repairs and maintenance of cranes, boomtrucks and lifting devices. Could include rental/leasing of cranes for extended periods.
|
7 |
|
Diving and Marine Work Services (11 planholders)
Work may include hardhat and scuba diving. Other work to include all aspects of marine work. For example, pile installation, dock repair, and marine river data collection.
|
9 |
|
Earthwork & Grading (53 planholders)
This work to include all types of earthwork and the use of various construction equipment, such as backhoes, excavators, rollers, dumptrucks, etc.
|
11 |
|
Electrical ** (16 planholders)
Contractors desiring to bid on work within this classification must be prequalified or qualified to perform the work as required by RCW 54.04.085 in order to obtain copies of the Small Works Request for Bid Proposal.
|
34** |
|
Electrical - Commercial/Industrial (16 planholders)
Contractor’s desiring to bid on work within this classification DO NOT need to be prequalified to perform work as required by RCW 54.04.085. Licensed contractors as required by RCW 19.28 capable of installing low voltage and high voltage up to 480/3/60.
|
51 |
|
Electrical Distribution Overhead (7 planholders)
Construction and maintenance of overhead electrical distribution lines and equipment, rated 5kV to 15kV located on wood or other type structures. Work typically involves energized work using hot line tools.
|
34-Aa |
|
Elevator Maintenance (2 planholders)
Elevator maintenance.
|
28 |
|
Fencing (17 planholders)
Chain link and wood fencing; new construction, repairs and maintenance.
|
27 |
|
Fiber Optics - Overhead Construction (5 planholders)
Installation of fiber optic hardware, stringing, sagging, clipping, guying, and setting anchors for fiber optic cable within the communication zone.
|
69 |
|
Fiber Optics - Splicing & Terminating (5 planholders)
New and existing installations of fiber optic systems which include underground and overhead inside the communication zone.
|
70 |
|
Fiber Optics - Underground (9 planholders)
Installation of fiber optic hardware and pulling cables through conduit and vaults or laying cable in an open trench.
|
71 |
|
Fishing Services
Provide manpower resources and equipment needed to capture predator fish.
|
31 |
|
General Construction by General Contractors (60 planholders)
Broad category, all types of general construction considered.
|
13 |
|
HVAC Systems Installation/Repair (12 planholders)
Heating, ventilating and air conditioning systems. Work to include new construction, repair work, plus maintenance work.
|
14 |
| Hydraulics and Pumping Units (15 planholders) | 39 |
|
Interpretive Facilities and Exhibits (3 planholders)
Creation of exhibits for museums, visitor centers, interpretive centers, interpretive graphics and interpretive signage.
|
54 |
|
Janitorial Services (2 planholders)
Labor, equipment, and all custodial cleaning products necessary to perform janitorial services.
|
55 |
|
Landscape and Irrigation Installation & Repair (21 planholders)
New installations, repairs and maintenance work. To include weed control for both landscaping and irrigation systems.
|
16 |
|
Logging and Wood Chipping (16 planholders)
Logging of land and chipping of woody debris.
|
42 |
|
Noxious Weed Control (5 planholders)
Noxious weed control by certified licensed contractors only. Work to include, but is not limited to, abatement of purple loosestrife, dalmatian toadflax, knapweed, thistle and/or other terrestrial noxious weeds.
|
48 |
|
Painting, Industrial Coating & Power Washing (30 planholders)
All aspects of painting & industrial coatings. Could include sandblasting, priming and preparation work.
|
18 |
|
Pole Inspection, Testing and Treatment (4 planholders)
Contractors desiring to bid on work within this classification must be prequalified or qualified to perform the work as required by RCW 54.04.085 in order to obtain copies of the Small Works Request for Bid Proposal. Contractor shall furnish all labor, equipment and products to inspect, test and treat wooden poles. The wooden poles are the infrastructure for overhead electric and fiber optic lines.
|
61 |
|
Pond Maintenance (8 planholders)
Involves sediment and hazardous waste removal from ponds.
|
66 |
|
Radio Systems Installation & Testing Services (1 planholders)
Installation and testing of antennas and radio frequency transmission lines. Installation, configuration, and testing of fixed radio transceivers and other radio frequency equipment and devices.
|
50 |
|
Railroad Repair & Maintenance (4 planholders)
Maintenance and repair of spur line railway.
|
38 |
|
Roofing Installation and Repair (14 planholders)
All aspects of the roofing industry. Could include new installation, repairs and maintenance.
|
22 |
|
Security (6 planholders)
Installation of security systems including detection devices, electronic access controls, CCTV cameras, monitoring equipment and control panels. Limited energy electrical contractor's license required pursuant to RCW 19.28.041.
|
52 |
|
Sign Making and Installation (2 planholders)
Includes fabrication, installation, repair, alteration, maintenance and dismantling of commercial signs, bulletins and poster panels in accordance with WAC 296-127-01374.
|
65 |
|
Smoke/Fire Detection and Suppression (8 planholders)
Installation and maintenance of fire & smoke detection systems. Control wiring and software programming for the Districts current alarm
system.
|
41 |
|
Snow Removal (13 planholders)
Involves snow removal at various District locations.
|
68 |
|
Solar Power Generation Installation (8 planholders)
Construction of new solar power generation applications.
|
40 |
|
Station Battery Installation and Removal (2 planholders)
Installation, removal, replacement and recycling of station batteries in a variety of locations, possibly including electrical substations and remote radio sites. Applicant must show evidence of proper equipment, experience and insurance to safely move and transport various styles of lead-acid station batteries.
|
67 |
|
Steel Fabrication & Welding, Machine Work (15 planholders)
Basics of steel fabrication, welding, and machine work, to the more specialized work of rebabbit bearings, metal stitching, heat treatment and retubing heat exchangers.
|
23 |
|
Telecommunications Wiring (5 planholders)
Inside building wiring, termination and testing using NORDX/CDT/Belden wiring systems with Cat-5, Cat-5e and Cat-6 cable with Gigabix terminal blocks. Occasional applications may also include telephone cable and coaxial cable.
|
53 |
|
Traffic Control (12 planholders)
Flaggers shall have current flagging card approved by WA State, transportation to job site, portable and stationary signs, cones, flagging vest, stop and slow paddles. Knowledge of WA State Traffic Control/Flagging safety laws.
|
46 |
|
Trailer Moving (2 planholders)
Mobile trailer and modular building transport, disassembly/assembly of mobile/modular units, skirting, anchoring, leveling, carpet, siding, roof seaming and set-up of units.
|
47 |
|
Transformer Transport, Load, Unload and Set (5 planholders)
Transportation, loading and unloading, or the placement of large power transformers onto concrete pads.
|
43 |
|
Tree Pruning/Tree Removal (7 planholders)
Tree pruning and or removing of trees and chipping branches. The tree pruning work will require proper arboriculture methods found in the American National Standard (ANSI) A300 for Tree Care Operations – Tree, Shrub, and Other Woody Plant Maintenance – Standard Practices.
|
63 |
|
Underground Conduit Installation (16 planholders)
Install underground electrical and fiber conduit by plowing,trenching or directional boring.
|
34-Fa |
|
Vehicle and Equipment Washing (2 planholders)
General labor to perform on site equipment washing.
|
49 |
|
Vehicle and Equipment Inspection and Repair (1 planholders)
Vehicle safety inspections, vehicle and equipment repair of all aspects of chassis related items, such as engine, transmission and drive train components.
|
59 |
|
Vehicle and Equipment Upfitting (1 planholders)
All aspects of upfitting new and used vehicles and specialized equipment with accessories and mounted equipment. Includes welding and fabrication, wiring and electrical and body and paint.
|
58 |
|
Vehicle Mounted Aerial Device Inspection, Repair and Refurbishment
All aspects of inspecting, dielectric testing, repairing and complete refurbishment of vehicle mounted aerial devices, such as those found on bucket trucks, digger derricks and cranes.
|
57 |
|
Vehicle Tire and Wheel Mounting and Repair, Vehicle Alignment
Mounting and repair of tires and wheels. Includes service calls, alignment and balancing of tires and wheels.
|
60 |
|
Wastewater Gravity Sewers (14 planholders)
Installation of gravity sewers, service laterals and appurtenances and repair/replacement of individual components.
|
W-C1 |
|
Wastewater Pressure Mains (13 planholders)
Installation of pressurized wastewater treatment plant and collection system piping, service laterals and appurtenances and repair/replacement of individual components.
|
W-B2 |
|
Wastewater STEP Tanks (10 planholders)
Installation of STEP tanks and appurtenances and connection to collection system in entirety and repair/replacement of individual components.
|
W-B1 |
|
Wastewater Treatment Facility Equipment (15 planholders)
Installation, removal, repair and replacement of wastewater pumps and treatment equipment.
|
W-C4 |
|
Water (25 planholders)
Contractors selecting this category must also complete the Water/Wastewater Classifications Section.
|
33 |
|
Water Booster Pumps (9 planholders)
Removal, repair and replacement of municipal booster pump station pumps and motors.
|
W-A5 |
|
Water Mains and Appurtenances (17 planholders)
Installation of water mains, services, hydrants and all appurtenances typical of a water distribution system, including piping within booster pump stations and storage tanks.
|
W-A2 |
|
Well & Piezometer Drilling (19 planholders)
All types of machine drilling are included in this classification.
|
24 |