Chelan PUD Public Library
|
Date |
SS
# |
Title |
|
|
565 |
Bill
7070: H.R. 7815 (A Bill) |
|
|
1128 |
The Archaeological Survey of Rocky
Reach Reservoir |
|
|
2546 |
Biological
Report: Rocky Reach Fisheries Research Program |
|
|
2556 |
Progress Report: Game Fish Studies |
|
|
2762 |
Comprehensive
Plan: Relocation Plan for |
|
|
1985 |
Study Report: Recreational
Resources of the Rocky Reach Project |
|
|
2381 |
Study
Report: Hydraulic Model Studies - Part II Fish Passage Facilities |
|
|
10 |
Stone & Webster: East Bank
Grouted Cutoff Report |
|
|
2559 |
Study
Report: Spawning Ground Surveys 1958/1959 |
|
|
2560 |
Study Report: Spawning Ground
Surveys Supplement 1960 |
|
|
1896 |
Study
Report: Sonic Tracking Study of Steelhead in Rocky Reach 9/65 |
|
|
1386 |
Biological Unit Plan for the Entiat Deer Herd on
the Entiat & |
|
|
2123 |
Study
Report: Reach Inventory Book |
|
|
2557 |
Study Report: Evaluation of the
Rainbow Trout Planting Program |
|
|
41 |
Recreation
Plan: |
|
|
8 |
EIS (Draft): Rocky Reach Exhibit R
Recreation Plan |
|
|
3 |
Rocky
Reach Exhibit R Recreation Plan |
|
|
2383 |
Study Report: Mysis Relicta |
|
|
2104 |
Study
Report: The Structure of an Anadromous Fish Resource |
|
|
2056 |
Periodic Safety |
|
|
39 |
Recreation
Plan: Douglas County Parks, 1977 |
|
|
2090 |
Pool Raise: Stone & Webster
Project Report No. 1 |
|
|
2086 |
Pool
Raise: Feasibility Study for Raising the Pool |
|
|
38 |
A Cultural Resources Overview of
BPA Mid-Columbia Project |
|
|
14 |
Stone
& Webster: Stability of Structures & Required Improvements Cals |
|
|
2106 |
Pool Raise: Draft Application for Raising the
Pool Elevation |
|
|
2080 |
Pool
Raise: Draft Environmental Impact Statement 7/81 |
|
|
15 |
Stone & Webster: Analysis of
the Center Dam Structures |
|
|
2553 |
Study
Report: Survival of Juvenile Salmon Passing through the Spillway |
|
|
2379 |
Study Report: Upstream Migrant
Fish Passage Facilities |
|
|
1984 |
Exhibit
R: |
|
|
2053 |
Periodic Safety Inspection Report:
July 1982 |
|
|
2548 |
Study
Report: Analysis of 1983 Loss Resulting from Proposed Water Spill |
|
|
1983 |
Exhibit R: Application for
Approval of Revised Exhibit R Rec Plan |
|
|
13 |
Stone
& Webster: Installation of Piezometers, Drains & Drilling Report |
|
|
2543 |
Study Report: Rocky Reach Migrant
Salmon Forebay Trap Report |
|
|
2558 |
Study
Report: Submersible Traveling Screen Due to Avoidance Behavior |
|
|
2544 |
Study Report: Developmental
Testing of a Prototype Fish Guidance System |
|
|
2055 |
Periodic
Safety Inspection Report: March 1987 |
|
|
2554 |
Study Report: Rocky Reach
Prototype Fish Guidance System Testing |
|
|
2555 |
Study
Report: Determination of Depth Distribution in the Turbine Intakes |
|
|
40 |
Water Quality and Hydraulic Conditions at |
|
|
2097 |
Pool
Raise: Rocky Reach Waterfowl and Bald Eagle Surveys 1988-89 |
|
|
12 |
Stone & Webster: Spillway
Erosion Repairs |
|
|
2083 |
Pool
Raise: Spillway Gates Modification & Extension SOW & Cost Est. |
|
|
2087 |
Pool Raise: Power Output Gains and
Ancroachments |
|
|
2082 |
Pool
Raise: Power Output Gains and Ancroachments |
|
|
2552 |
Study Report: Rocky Reach Fish
Guidance System 1989 Testing |
|
|
2084 |
Pool
Raise: Review of Stability Analysis of Center Dam Structures |
|
|
2117 |
Pool Raise: Bald Eagle Winter Use
Along RR Reservoir 1990 |
|
|
2208 |
Pool
Raise: RR Goose Nesting Status Related to the Proposed Pool Raise |
|
|
2059 |
Pool Raise: Feasibility Study for
Raising the Pool |
|
|
16 |
Stone
& Webster: Review of Stability Analysis of Structures Vol I |
|
|
2060 |
Pool Raise: Agency Consultation
Pkg for Raising the Pool Elevation |
|
|
2095 |
Pool
Raise: Rocky Reach Reservoir Waterfowl & Bald Eagle Surveys 8/90 |
|
|
2545 |
|
|
|
197 |
Environmental
& Public Use Inspection: Report for June 1987- June 1990 |
|
|
2071 |
Pool Raise: Fingerling Bypass
System Study |
|
|
18 |
Stone
& Webster: Review of Stability Analysis of Structures Vol II |
|
|