Library Index Study List

Chelan PUD Public Library

Date

SS #

Title

05/12/54

565

Bill 7070: H.R. 7815 (A Bill)

12/31/56

1128

The Archaeological Survey of Rocky Reach Reservoir

01/01/58

2546

Biological Report: Rocky Reach Fisheries Research Program

03/01/58

2556

Progress Report: Game Fish Studies

12/15/58

2762

Comprehensive Plan: Relocation Plan for Entiat Wa 1958

12/01/59

1985

Study Report: Recreational Resources of the Rocky Reach Project

12/01/59

2381

Study Report: Hydraulic Model Studies - Part II Fish Passage Facilities

12/23/59

10

Stone & Webster: East Bank Grouted Cutoff Report

12/30/59

2559

Study Report: Spawning Ground Surveys 1958/1959

01/01/60

2560

Study Report: Spawning Ground Surveys Supplement 1960

09/01/65

1896

Study Report: Sonic Tracking Study of Steelhead in Rocky Reach 9/65

08/01/70

1386

Biological Unit Plan for the Entiat Deer Herd on the Entiat & Lake Wen

03/01/73

2123

Study Report: Reach Inventory Book

09/01/73

2557

Study Report: Evaluation of the Rainbow Trout Planting Program

11/01/73

41

Recreation Plan: Wenatchee Urban Area Park & Recreation

09/06/74

8

EIS (Draft): Rocky Reach Exhibit R Recreation Plan

12/01/74

3

Rocky Reach Exhibit R Recreation Plan

01/01/76

2383

Study Report: Mysis Relicta

01/01/77

2104

Study Report: The Structure of an Anadromous Fish Resource

02/01/77

2056

Periodic Safety

09/01/77

39

Recreation Plan: Douglas County Parks, 1977

11/30/79

2090

Pool Raise: Stone & Webster Project Report No. 1

10/01/80

2086

Pool Raise: Feasibility Study for Raising the Pool

01/01/81

38

A Cultural Resources Overview of BPA Mid-Columbia Project

02/01/81

14

Stone & Webster: Stability of Structures & Required Improvements Cals

03/09/81

2106

Pool Raise: Draft Application for Raising the Pool Elevation 3/9/81

07/01/81

2080

Pool Raise: Draft Environmental Impact Statement 7/81

09/01/81

15

Stone & Webster: Analysis of the Center Dam Structures

09/01/81

2553

Study Report: Survival of Juvenile Salmon Passing through the Spillway

02/01/82

2379

Study Report: Upstream Migrant Fish Passage Facilities

06/02/82

1984

Exhibit R: Lincoln Rock State Park Schematic Master Plan

07/01/82

2053

Periodic Safety Inspection Report: July 1982

10/01/82

2548

Study Report: Analysis of 1983 Loss Resulting from Proposed Water Spill

01/01/83

1983

Exhibit R: Application for Approval of Revised Exhibit R Rec Plan

06/01/83

13

Stone & Webster: Installation of Piezometers, Drains & Drilling Report

02/01/84

2543

Study Report: Rocky Reach Migrant Salmon Forebay Trap Report

01/01/87

2558

Study Report: Submersible Traveling Screen Due to Avoidance Behavior

02/25/87

2544

Study Report: Developmental Testing of a Prototype Fish Guidance System

03/01/87

2055

Periodic Safety Inspection Report: March 1987

03/10/87

2554

Study Report: Rocky Reach Prototype Fish Guidance System Testing

03/10/87

2555

Study Report: Determination of Depth Distribution in the Turbine Intakes

03/23/87

40

Water Quality and Hydraulic Conditions at Daroga Park

01/01/89

2097

Pool Raise: Rocky Reach Waterfowl and Bald Eagle Surveys 1988-89

02/01/89

12

Stone & Webster: Spillway Erosion Repairs

10/01/89

2083

Pool Raise: Spillway Gates Modification & Extension SOW & Cost Est.

10/01/89

2087

Pool Raise: Power Output Gains and Ancroachments

11/01/89

2082

Pool Raise: Power Output Gains and Ancroachments

12/01/89

2552

Study Report: Rocky Reach Fish Guidance System 1989 Testing

12/14/89

2084

Pool Raise: Review of Stability Analysis of Center Dam Structures

01/01/90

2117

Pool Raise: Bald Eagle Winter Use Along RR Reservoir 1990

01/01/90

2208

Pool Raise: RR Goose Nesting Status Related to the Proposed Pool Raise

01/01/90

2059

Pool Raise: Feasibility Study for Raising the Pool

03/01/90

16

Stone & Webster: Review of Stability Analysis of Structures Vol I

04/01/90

2060

Pool Raise: Agency Consultation Pkg for Raising the Pool Elevation

08/01/90

2095

Pool Raise: Rocky Reach Reservoir Waterfowl & Bald Eagle Surveys 8/90

09/01/90

2545

Columbia Basin System Planning Salmon & Steelhead Production Plan

09/06/90

197

Environmental & Public Use Inspection: Report for June 1987- June 1990

09/28/90

2071

Pool Raise: Fingerling Bypass System Study

11/01/90

18

Stone & Webster: Review of Stability Analysis of Structures Vol II

12/01/90