Crews install an "H" structure near the west end of
the line above Andrew York/Monitor Switchyard.
The Wenatchee River is in the distance.

A boom lifts the 4-ton top or "cap"
section of a steel structure into place.
Workers use a bucket truck to reach
the joints and bolt each section in place.

Steel poles for power line structures are moved to assembly site.

“H” structure is readied for installation at Andrew York Switchyard.

Rusted steel finish is designed to blend into the hillside.

Helicopter helps string transmission line.

Crews prepare to pull line from reels.

Transmission line stretches across Burch Mountain.