| Date |
Document | Article |
|---|---|---|
Showing records 1 thru 401 of 401 records. |
||
| 01/01/50 | Monitoring and Evaluation (summary of all activities) | Monitoring and Evaluation Activities |
| 05/15/13 | 2013 Annual Work Plan (submittal to FERC) | Article 404 |
| 2013 Fish Stocking Report (submittal to FERC) | Article 404 | |
| 05/02/13 | Errata Notice-Order Approving Revised Historic Properties Management Plan (FERC's correction of filing date) | Article 401 |
| 04/30/13 | 2012 Annual Flow and Water Temperature Report (submittal to FERC) | Article 405 |
| 04/30/13 | 2012 Annual Report (submittal to FERC) | Article 403 |
| 04/30/13 | 2012-2013 Winter Wildlife Survey Report (submittal to FERC) | Article 406 |
| 04/30/13 | 2013 Biological Objectives Status Report (submittal to FERC) | Article 401 |
| 2013 Biological Objectives Status Report (submittal to FERC) | Article 408 | |
| 04/30/13 | 2013 Stehekin Work Plan (submittal to FERC) | Article 403 |
| 04/25/13 | Traditional Cultural Properties Management Plan, Revised (approval from FERC) | Article 401 |
| 04/18/13 | Minimum Flow and Ramping Rate Deviation Report (March 18, 2013) (submittal to FERC) | Article 405 |
| 04/10/13 | 2008-2012 Wildlife Activity Report and 2013-2017 Wildlife Work Plan (submittal to FERC) | Article 406 |
| 2013-2017 Wildlife Work Plan and 2008-2012 Wildlife Activity Report (submittal to FERC) | Article 406 | |
| 03/20/13 | Minimum Flow and Ramping Rate Deviation Report (March 18, 2013) (Chelan PUD email notification) | Article 405 |
| 02/28/13 | 2012 Annual Lake Level Report (submittal to FERC) | Article 405 |
| 01/01/13 | 2012 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD) | Monitoring and Evaluation Activities |
| 12/31/12 | 2012 4th Quarter Daily Flow Report | Article 405 |
| 12/31/12 | 2012 4th Quarter Hourly Flow Report | Article 405 |
| 12/31/12 | 2012 Chelan River Daily Temperature Report - 4th Quarter | Appendix D |
| 12/31/12 | 2012 Chelan River Hourly Temperature Report - 4th Quarter | Appendix D |
| 11/23/12 | 2012 Annual Cultural Activities Report (submittal to FERC) | Article 410 |
| 10/24/12 | Traditional Cultural Properties Management Plan, Revised (submittal to FERC) | Article 401 |
| 09/28/12 | 2012 3rd Quarter Daily Flow Report | Article 405 |
| 09/28/12 | 2012 3rd Quarter Hourly Flow Report | Article 405 |
| 09/28/12 | 2012 Chelan River Daily Temperature Report - 3rd Quarter | Appendix D |
| 09/28/12 | 2012 Chelan River Hourly Temperature Report - 3rd Quarter | Appendix D |
| 07/16/12 | 2011 Whitewater Monitoring Study (approval from FERC) | Article 407 |
| Recreation Resources Management and Implementation Plan Amendment (approval from FERC) | Article 407 | |
| 06/29/12 | 2012 2nd Quarter Daily Flow Report | Article 405 |
| 06/29/12 | 2012 2nd Quarter Hourly Flow Report | Article 405 |
| 06/29/12 | 2012 Chelan River Daily Temperature Report - 2nd Quarter | Appendix D |
| 06/29/12 | 2012 Chelan River Hourly Temperature Report - 2nd Quarter | Appendix D |
| 06/25/12 | 2009-2011 Lower Stehekin River Cutthroat and Rainbow Trout Spawning Surveys (National Park Service) | Monitoring and Evaluation Activities |
| 05/10/12 | 2012 Annual Work Plan (submittal to FERC) | Article 404 |
| 2012 Fish Stocking Report (submittal to FERC) | Article 404 | |
| 05/01/12 | 2009-2011 Whitewater Monitoring Study (submittal to FERC) | Article 407 |
| 2009-2011 Whitewater Monitoring Study (submittal to FERC) | Whitewater Boating | |
| 04/26/12 | 2011-2012 Winter Wildlife Survey Report (submittal to FERC) | Article 406 |
| 04/24/12 | 2011 Activity Report and2012 Work Plan (submittal to FERC) | Article 406 |
| 2012 Wildlife Work Plan and 2011 Activity Report (submittal to FERC) | Article 406 | |
| 04/06/12 | 2011 Annual Report (submittal to FERC) | Article 403 |
| 2012 Stehekin Work Plan (submittal to FERC) | Article 403 | |
| 03/30/12 | 2012 1st Quarter Daily Flow Report | Article 405 |
| 03/30/12 | 2012 1st Quarter Hourly Flow Report | Article 405 |
| 03/30/12 | 2012 Chelan River Daily Temperature Report - 1st Quarter | Appendix D |
| 03/30/12 | 2012 Chelan River Hourly Temperature Report - 1st Quarter | Appendix D |
| 03/28/12 | 2011 Annual Flow and Water Temperature Report (submittal to FERC) | Article 405 |
| 02/28/12 | 2011 Annual Lake Level Report (submittal to FERC) | Article 405 |
| 02/24/12 | 2011 Annual Flow and Water Temperature Report (time extension request granted) | Article 405 |
| 02/15/12 | 2011 Chelan River Daily and Hourly Temperature Report - 2011 September, 3rd Quarter, and 4th Quarter | Appendix D |
| 02/03/12 | 2011 Annual Flow and Water Temperature Report (request for time extension) | Article 405 |
| 02/01/12 | 2011 4th Quarter Hourly and Daily Flow Report | Article 405 |
| 01/31/12 | 2011 Annual Implementation and Monitoring Report (submittal to FERC) | Article 408 |
| 01/11/12 | Stehekin Area Dust Emissions 5-year Report (approval from FERC) | Article 403 |
| 01/02/12 | 2011 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD) | Monitoring and Evaluation Activities |
| 12/08/11 | Traditional Cultural Properties Management Plan (approval from FERC) | Article 401 |
| 12/02/11 | 2011 Annual Cultural Activities Report (submittal to FERC) | Article 410 |
| 12/01/11 | 2011 Archaeologica Monitoring Report (prepared by Cultural Resource Consultants) | Article 401 |
| 11/03/11 | Stehekin Area Dust Emissions 5-year Report (submittal to FERC) | Article 403 |
| 10/31/11 | 2011 3rd Quarter Daily Flow Report | Article 405 |
| 10/31/11 | 2011 3rd Quarter Hourly Flow Report | Article 405 |
| 10/21/11 | Minimum Flow and Ramping Rate Deviations (May 15 and 17, 2001) (response from FERC) | Article 405 |
| 10/11/11 | Traditional Cultural Properties Management Plan (submittal to FERC) | Article 401 |
| 09/30/11 | 2011 Chelan River Daily Temperature Report - August | Appendix D |
| 09/30/11 | 2011 Chelan River Hourly Temperature Report - August | Appendix D |
| 09/29/11 | Lake Level Target Deviation (May 1, 2011 and June 1, 2011) (response from FERC) | Article 405 |
| 09/28/11 | Minimum Flow and Ramping Rate Deviation (April 18, 2011) (response from FERC) | Article 405 |
| 08/29/11 | Lake Chelan Mule Deer and Big Horn Sheep Winter Range Habitat (Cascadia Conservation District) | Article 406 |
| 08/02/11 | Stehekin Riparian Zone Plan (approval from FERC) | Article 403 |
| 07/31/11 | 2011 Chelan River Daily Temperature Report - July | Appendix D |
| 07/31/11 | 2011 Chelan River Hourly Temperature Report - July | Appendix D |
| 07/27/11 | 2011 Whitewater Boating Monitoring Study Revised Schedule (submittal to FERC) | Article 407 |
| 2011 Whitewater Boating Monitoring Study Revised Schedule (submittal to FERC) | Whitewater Boating | |
| 06/30/11 | 2011 2nd Quarter Daily Flow Report | Article 405 |
| 06/30/11 | 2011 2nd Quarter Hourly Flow Report | Article 405 |
| 06/30/11 | 2011 Annual Work Plan (acknowledgement of receipt from FERC) | Article 404 |
| 06/30/11 | 2011 Chelan River Daily Temperature Report - 2nd Quarter | Appendix D |
| 06/30/11 | 2011 Chelan River Hourly Temperature Report - 2nd Quarter | Appendix D |
| 06/29/11 | Lake Level Target Deviation Report (June 1, 2011) (submittal to FERC) | Article 405 |
| 06/16/11 | Minimum Flow and Ramping Rate Deviation Report (May 15 and 17, 2011) (submittal to FERC) | Article 405 |
| 06/02/11 | Lake Level Target Deviation Notice (June 1, 2011) (Chelan PUD email notification) | Article 405 |
| 06/01/11 | 2011 Annual Work Plan (submittal to FERC) | Article 404 |
| 2011 Fish Stocking Report (submittal to FERC) | Article 404 | |
| 05/31/11 | Lake Level Target Deviation Report (May 1, 2011) (submittal to FERC) | Article 405 |
| 05/25/11 | 2011 Tributary Barriers Photographs | Tributary Barriers |
| 05/19/11 | Minimum Flow and Ramping Rate Deviation Notice (May 15 and 17, 2011) (Chelan PUD email notification) | Article 405 |
| 05/19/11 | Minimum Flow and Ramping Rate Deviation Report (April 18, 2011) (submittal to FERC) | Article 405 |
| 05/18/11 | Minimum Flow and Ramping Rate Deviation (April 18, 2011) (submittal to FERC) | Article 405 |
| 05/10/11 | Traditional Cultural Properties Management Plan (third request for extension of time granted by FERC) | Article 401 |
| 05/02/11 | Lake Level Target Devviation Notice (May 1, 2011) (Chelan PUD email notification) | Article 405 |
| 04/29/11 | 2010 Activity Report and 2011 Wildlife Work Plan (submittal to FERC) | Article 406 |
| 04/29/11 | 2010 Annual Report (submittal to FERC) | Article 403 |
| 04/29/11 | 2010-2011 Winter Wildlife Survey Report (submittal to FERC) | Article 406 |
| 04/29/11 | 2011 Stehekin Work Plan (submittal to FERC) | Article 403 |
| 04/29/11 | 2011 Wildlife Work Plan and 2010 Activity Report (submittal to FERC) | Article 406 |
| 04/22/11 | 2011 1st Quarter Daily Flow Report | Article 405 |
| 04/22/11 | 2011 1st Quarter Hourly Flow Report | Article 405 |
| 04/22/11 | 2011 Chelan River Daily Temperature Report - 1st Quarter | Appendix D |
| 04/22/11 | 2011 Chelan River Hourly Temperature Report - 1st Quarter | Appendix D |
| 04/21/11 | 2010 Annual Lake Level Report (acknowledgement of receipt from FERC) | Article 405 |
| 04/20/11 | Minimum Flow and Ramping Rate Deviation Notice (April 18, 2011) (Chelan PUD email notification) | Article 405 |
| 03/04/11 | 2010 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC) | Article 408 |
| 02/28/11 | 2010 Annual Flow and Water Temperature Report (submittal to FERC) | Article 405 |
| 02/28/11 | 2010 Annual Lake Level Report (submittal to FERC) | Article 405 |
| 02/04/11 | Erosion Sites 24, 25, 26, 27 (order granting a revised schedule from FERC) | Article 401 |
| 01/31/11 | 2010 4th Quarter Daily Flow Report | Article 405 |
| 01/31/11 | 2010 4th Quarter Hourly Flow Report | Article 405 |
| 01/31/11 | 2010 Whitewater Monitoring Study (approval from FERC) | Article 407 |
| 01/21/11 | 2010 Annual Implementation and Monitoring Report (submittal to FERC) | Article 408 |
| 01/21/11 | 2010 Whitewater Monitoring Study (submittal to FERC) | Article 407 |
| 01/13/11 | 2010 Annual Cultural Activities Report (approval from FERC) | Article 410 |
| 12/31/10 | 2010 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD) | Monitoring and Evaluation Activities |
| 12/17/10 | Erosion Sites 24, 25, 26, 27 (notification of revised schedule) | Article 401 |
| 12/06/10 | 2010 Annual Cultural Activities Report (submittal to FERC) | Article 410 |
| 11/29/10 | 2009 Lower Stehekin River Cutthroat and Rainbow Trout Spawing Surveys (National Park Service) | Monitoring and Evaluation Activities |
| 11/17/10 | Chelan River Implementation Monitoring Report (acknowledgement of receipt from FERC (second)) | Article 408 |
| 11/15/10 | 2010 Whitewater Boating Monitoring Study (approval of revised schedule from FERC) | Article 407 |
| 2010 Whitewater Boating Monitoring Study (approval of revised schedule from FERC) | Whitewater Boating | |
| 11/08/10 | Reach 1 Trail Extension As-built (submittal to FERC) | Reach 1 Access Trail |
| Reach 1 Trail Extension As-built (submittal to FERC) | Riverwalk Loop Trail Extension | |
| 11/08/10 | Traditional Cultural Properties Management Plan (request for third extension of time submittal to FERC) | Article 401 |
| 11/01/10 | Stehekin Riparian Zone Plan (submittal to FERC) | Article 403 |
| 10/29/10 | 2010 3rd Quarter Daily Flow Report | Article 405 |
| 10/29/10 | 2010 3rd Quarter Hourly Flow Report | Article 405 |
| 10/29/10 | 2010 Chelan River Daily Temperature Report - 3rd Quarter | Appendix D |
| 10/29/10 | 2010 Chelan River Daily Temperature Report - September | Appendix D |
| 10/29/10 | 2010 Chelan River Hourly Temperature Report - 3rd Quarter | Appendix D |
| 10/29/10 | 2010 Chelan River Hourly Temperature Report - September | Appendix D |
| 09/30/10 | 2010 Chelan River Daily Temperature Report - August | Appendix D |
| 09/30/10 | 2010 Chelan River Hourly Temperature Report - August | Appendix D |
| 09/16/10 | Chelan River Implementation Monitoring Report (acknowledgement of receipt from FERC) | Article 408 |
| 08/31/10 | 2010 Chelan River Daily Temperature Report - July | Appendix D |
| 08/31/10 | 2010 Chelan River Hourly Temperature Report - July | Appendix D |
| 08/12/10 | Chelan River Implementation Monitoring Report (submittal to FERC and National Marine Fisheries Service) | Article 408 |
| 07/30/10 | 2010 Chelan River Daily Temperture Report-2nd Quarter | Appendix D |
| 07/30/10 | 2010 Chelan River Hourly Temperature Report-2nd Quarter | Appendix D |
| 07/29/10 | 2010 2nd Quarter Daily Flow Report | Article 405 |
| 07/29/10 | 2010 2nd Quarter Hourly Flow Report | Article 405 |
| 07/22/10 | 2010 Annual Work Plan (acknowledgement of receipt from FERC) | Article 404 |
| 07/08/10 | 2009 Annual Flow Report (acknowledgement of receipt from FERC) | Article 405 |
| 07/08/10 | 2009 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC) | Article 408 |
| 07/08/10 | 2009 Annual Lake Level Report (acknowledgement of receipt from FERC) | Article 405 |
| 07/08/10 | Implementation Monitoring Report Revised Schedule (acknowledgement of receipt from FERC) | Article 408 |
| 07/07/10 | 2010 Whitewater Boating Monitoring Study (submittal of revised schedule to FERC) | Article 407 |
| 2010 Whitewater Boating Monitoring Study (submittal of revised schedule to FERC) | Whitewater Boating | |
| 06/08/10 | 2009 Annual Winter Survey and 2009 Wildlife Activity Report (acknowledgement of receipt from FERC) | Article 406 |
| 2010 Wildlife Work Plan (acknowledgement of receipt from FERC) | Article 406 | |
| 05/31/10 | 2010 Archaeological Monitoring Report (prepared by Cultural Resource Consultants) | Article 401 |
| 05/27/10 | 2010 Annual Work Plan (submittal to FERC) | Article 404 |
| 2010 Fish Stocking Report (submittal to FERC) | Article 404 | |
| 05/19/10 | Biological Objectives Status Reports (approval of Revised Schedule from FERC) | Article 401 |
| Biological Objectives Status Reports (approval of Revised Schedule from FERC) | Article 408 | |
| 05/03/10 | Implementation Monitoring Report Revised Schedule (submittal to FERC and National Marine Fisheries Service) | Article 408 |
| 04/30/10 | 2009 Wildlife Activity Report (submittal to FERC) | Article 406 |
| 04/30/10 | 2009-2010 Winter Wildlife Survey (submittal to FERC) | Article 406 |
| 04/30/10 | 2010 Wildlife Work Plan (submittal to FERC) | Article 406 |
| 04/28/10 | 2010 1st Quarter Daily Flow Report | Article 405 |
| 04/28/10 | 2010 1st Quarter Hourly Flow Report | Article 405 |
| 04/08/10 | 2009 Annual Report (submittal to FERC) | Article 403 |
| 04/08/10 | 2009 Archaeological Monitoring Report (prepared by Cultural Resource Consultants) | Article 401 |
| 04/08/10 | 2010 Stehekin Work Plan (submittal to FERC) | Article 403 |
| 03/31/10 | 2010 Chelan River Daily Temperature Report-1st Quarter | Appendix D |
| 03/31/10 | 2010 Chelan River Hourly Temperature Report-1st Quarter | Appendix D |
| 03/30/10 | Chelan River Project Final Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Chelan River Project Final Report (acknowledgement of receipt from FERC) | Pump Station Design | |
| Chelan River Project Final Report (acknowledgement of receipt from FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 03/29/10 | Cultural Resources Interpretive and Education Program (approval from FERC) | Article 401 |
| 03/29/10 | Site Specific Erosion Control Plan (Sites 24, 25, 26, and 27) (approval from FERC) | Article 401 |
| 03/12/10 | Erosion Control Report-Corral and Prince Creek (Sites 11 and 55) | Article 401 |
| 03/09/10 | Biological Objectives Status Reports (submittal of Revised Schedule to FERC) | Article 401 |
| Biological Objectives Status Reports (submittal of Revised Schedule to FERC) | Article 408 | |
| 03/03/10 | 2009 Whitewater Boating on the Chelan River Monitoring Study (approval from FERC) | Article 407 |
| 02/26/10 | 2009 Annual Flow Report (submittal to FERC) | Article 405 |
| 02/25/10 | 2009 Annual Lake Level Report (submittal to FERC) | Article 405 |
| 02/01/10 | Predation Impacts of Lake Trout and Chinook Salmon in Lake Chelan (Washington Cooperative Fish and Wildlife Research Unit) | Lake Chelan Food Web Model |
| 01/29/10 | 2009 4th Quarter Daily Flow Report | Article 405 |
| 01/29/10 | 2009 4th Quarter Hourly Flow Report | Article 405 |
| 01/28/10 | Chelan River Project Final Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project Final Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project Final Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 01/25/10 | 2009 Annual Implementation and Monitoring Report (submittal to FERC) | Article 408 |
| 01/14/10 | Minimum Flow Deviation (October 24 - 26, 2009) (response from FERC) | Article 405 |
| 01/11/10 | 2009 Whitewater Boating on the Chelan River Monitoring Study (submittal to FERC) | Article 407 |
| 12/31/09 | 2009 Chelan River Daily Temperature Report-4th Quarter | Appendix D |
| 12/31/09 | 2009 Chelan River Hourly Temperature Report-4th Quarter | Appendix D |
| 12/31/09 | 2009 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD) | Monitoring and Evaluation Activities |
| 12/09/09 | 2009 Annual Cultural Activities Report (approval from FERC) | Article 410 |
| 12/03/09 | 2009 Annual Cultural Activities Report (submittal to FERC) | Article 410 |
| 12/01/09 | 2009 Lake Chelan Cutthroat Trout Spawning Ground Survey Report (US Department of Agriculture-Forest Service) | Monitoring and Evaluation Activities |
| 11/25/09 | Minimum Flow Deviation Report (October 24-26, 2009) (submittal to FERC) | Article 405 |
| 11/20/09 | Riparian Zone Action Plan (order granting extension of time from FERC) | Article 403 |
| 11/18/09 | Site Specific Erosion Control Plan (Sites 24, 25, 26, and 27) (submittal to FERC) | Article 401 |
| 10/30/09 | 2009 3rd Quarter Daily Flow Report | Article 405 |
| 10/30/09 | 2009 3rd Quarter Hourly Flow Report | Article 405 |
| 10/30/09 | Cultural Resources Interpretive and Education Program (submittal to FERC) | Article 401 |
| 10/28/09 | Minimum Flow Deviation Notice (October 24-26, 2009) (Chelan PUD email notification) | Article 405 |
| 10/02/09 | 2008 Annual Winter Survey (acknowledgement of receipt from FERC) | Article 406 |
| 2008 Wildlife Activity Report (acknowledgement of receipt from FERC) | Article 406 | |
| 2009 Wildlife Work Plan (acknowledgement of receipt from FERC) | Article 406 | |
| 09/15/09 | 2008 Annual Report (acknowledgement of receipt from FERC) | Article 403 |
| 2009 Work Plan (acknowledgement of receipt from FERC) | Article 403 | |
| 09/15/09 | Chelan River Project 14th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Chelan River Project 14th Monthly Report (acknowledgement of receipt from FERC) | Pump Station Design | |
| Chelan River Project 14th Monthly Report (acknowledgement of receipt from FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 08/20/09 | Lake Chelan Tributary Passage Final Design | Tributary Barriers |
| 08/14/09 | Chelan River Project 12th and 13th Monthly Reports (acknowledgement of receipt from FERC) | Low Level Outlet |
| Chelan River Project 12th and 13th Monthly Reports (acknowledgement of receipt from FERC) | Pump Station Design | |
| Chelan River Project 12th and 13th Monthly Reports (acknowledgement of receipt from FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 08/14/09 | Chelan River Project 14th Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project 14th Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project 14th Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 08/14/09 | Reach 1 Access Trail Final Construction Report (acknowledgement of receipt from FERC) | Reach 1 Access Trail |
| 08/13/09 | Riparian Zone Action Plan (time extension request submittal to FERC) | Article 403 |
| 07/31/09 | 2009 2nd Quarterly Daily Flow Report | Article 405 |
| 07/31/09 | 2009 2nd Quarterly Hourly Flow Report | Article 405 |
| 07/15/09 | Chelan River Project 13th Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project 13th Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project 13th Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 07/07/09 | 2009 Whitewater Boating Monitoring Study Revised Schedule (submittal to FERC) | Article 407 |
| 2009 Whitewater Boating Monitoring Study Revised Schedule (submittal to FERC) | Whitewater Boating | |
| 06/26/09 | Lake Chelan Tributary Passage Preliminary Design | Tributary Barriers |
| 06/17/09 | Chelan River Project 11th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Chelan River Project 11th Monthly Report (acknowledgement of receipt from FERC) | Pump Station Design | |
| Chelan River Project 11th Monthly Report (acknowledgement of receipt from FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 06/12/09 | Chelan River Project 12th Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project 12th Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project 12th Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 05/14/09 | Chelan River Project 11th Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project 11th Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project 11th Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 05/04/09 | Riverwalk Loop Trail Extension Contract Plans and Specifications (acknowledgement of receipt from FERC) | Riverwalk Loop Trail Extension |
| 04/30/09 | 2008-2009 Winter Wildlife Survey (submittal to FERC) | Article 406 |
| 04/27/09 | 2008 Wildlife Activity Report (submittal to FERC) | Article 406 |
| 2009 Wildlife Work Plan (submittal to FERC) | Article 406 | |
| 04/22/09 | Erosion Control Treatment- Deer Point Campground (Site 58) | Article 401 |
| 04/14/09 | Chelan River Project 10th Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project 10th Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project 10th Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 04/10/09 | Chelan River Project 9th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Chelan River Project 9th Monthly Report (acknowledgement of receipt from FERC) | Pump Station Design | |
| Chelan River Project 9th Monthly Report (acknowledgement of receipt from FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 04/09/09 | Chelan River Project 8th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Chelan River Project 8th Monthly Report (acknowledgement of receipt from FERC) | Pump Station Design | |
| Chelan River Project 8th Monthly Report (acknowledgement of receipt from FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 04/08/09 | 1st Quarter Report - Mitchelle Creek Campground (Site 59) (draft report) | Article 401 |
| 04/02/09 | Lake Chelan Tributary Field Trip | Tributary Barriers |
| 03/31/09 | 2009 1st Quarterly Daily Flow Report | Article 405 |
| 03/31/09 | 2009 1st Quarterly Hourly Flow Report | Article 405 |
| 03/26/09 | 2008 Annual Flow Report (acknowledgement of receipt from FERC) | Article 405 |
| 2008 Annual Lake Level Report (acknowledgement of receipt from FERC) | Article 405 | |
| 03/26/09 | 2009 Annual Work Plan (acknowledgement of receipt from FERC) | Article 404 |
| 03/25/09 | 2008 Annual Report (submittal to FERC) | Article 403 |
| 2009 Work Plan (submittal to FERC) | Article 403 | |
| 03/13/09 | Chelan River Project 9th Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project 9th Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project 9th Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 02/27/09 | 2008 Annual Flow Report (submittal to FERC) | Article 405 |
| 02/27/09 | 2008 Annual Lake Level Report (submittal to FERC) | Article 405 |
| 02/27/09 | Final Construction Report and As-built (submittal to FERC) | Reach 1 Access Trail |
| 02/24/09 | 2008 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC) | Article 408 |
| 02/17/09 | 2009 Annual Work Plan (submittal to FERC) | Article 404 |
| 2009 Fish Stocking Report (submittal to FERC) | Article 404 | |
| 02/13/09 | Chelan River Project 8th Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project 8th Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project 8th Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 02/05/09 | 2009 Hydropower Development Recreation Report-Form 80 (submittal to FERC) | Article 407 |
| 02/01/09 | 2009 Tributary Mouth Photographs | Tributary Barriers |
| 01/30/09 | 2008 4th Quarterly Daily Flow Report | Article 405 |
| 01/30/09 | 2008 4th Quarterly Hourly Flow Report | Article 405 |
| 01/30/09 | Chelan River Project 7th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Chelan River Project 7th Monthly Report (acknowledgement of receipt from FERC) | Pump Station Design | |
| Chelan River Project 7th Monthly Report (acknowledgement of receipt from FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 01/29/09 | 2008 Annual Implementation and Monitoring Report (submittal to FERC) | Article 408 |
| 01/29/09 | Riverwalk Loop Trail Extension Contract Plans and Specifications (submittal to FERC) | Riverwalk Loop Trail Extension |
| 01/27/09 | 2007 and 2008 Annnual Cultural Activities Reports (acknowledgement of receipt from FERC) | Article 410 |
| 01/26/09 | Chelan River Project 6th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Chelan River Project 6th Monthly Report (acknowledgement of receipt from FERC) | Pump Station Design | |
| Chelan River Project 6th Monthly Report (acknowledgement of receipt from FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 01/14/09 | Chelan River Project 7th Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project 7th Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project 7th Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 12/31/08 | 2007-2008 Winter Wildlife Report | Article 406 |
| 12/31/08 | 2008 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD) | Monitoring and Evaluation Activities |
| 12/18/08 | Lake Chelan Kokanee Management Plan (Washington Department of Fish and Wildlife) | Article 404 |
| 12/15/08 | Chelan River Project Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 12/05/08 | 2008 Annual Report of Cultural Activities (submittal letter to FERC) | Article 410 |
| 11/14/08 | Chelan River Project Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 11/05/08 | Tailrace-spawning Habitat | Reach 4/Tailrace Habitat Enhancement |
| 10/15/08 | Chelan River Project Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 10/02/08 | Traditional Cultural Properties Management Plan (second request for extension of time granted by FERC) | Article 401 |
| 09/30/08 | 2008 3rd Quarterly Daily Flow Report | Article 405 |
| 09/30/08 | 2008 3rd Quarterly Hourly Report | Article 405 |
| 09/24/08 | Chelan Ranger District Large Fire History 2000-2007 | Tributary Barriers |
| 09/23/08 | 2008 Archaeological Monitoring Survey (prepared by Cultural Resource Consultants) | Article 401 |
| 09/15/08 | Traditional Cultural Properties Management Plan (request for second extension of time submittal to FERC) | Article 401 |
| 09/12/08 | Chelan River Project Montly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project Montly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project Montly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 09/02/08 | Riverwalk Loop Trail Extension (order granting time extension for construction from FERC) | Riverwalk Loop Trail Extension |
| Whitewater Boating (order granting time extension from FERC) | Article 407 | |
| Whitewater Boating (order granting time extension to conduct Whitewater Boating Study) | Whitewater Boating | |
| 09/01/08 | Stehekin River Kokanee Photographs (Washington State Department of Fish and Wildlife) | Monitoring and Evaluation Activities |
| 08/21/08 | Reach 1 Trail (authorization to begin construction granted from FERC) | Reach 1 Access Trail |
| 08/15/08 | Chelan River Project Monthly Report (submittal to FERC) | Low Level Outlet |
| Chelan River Project Monthly Report (submittal to FERC) | Pump Station Design | |
| Chelan River Project Monthly Report (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 07/28/08 | Little Creek Photos | Tributary Barriers |
| 06/30/08 | 2008 2nd Quarterly Daily Flow Report | Article 405 |
| 06/30/08 | 2008 2nd Quarterly Hourly Flow Report | Article 405 |
| 06/02/08 | Reach 1 Access Trail Contract Plans (request for approval of contract plans sent to FERC) | Reach 1 Access Trail |
| Riverwalk Loop Trail Extension (request for specifications and revised construction schedule submitted to FERC) | Riverwalk Loop Trail Extension | |
| Whitewater Boating (revised schedule request regarding Whitewater Boating Monitoring Study) | Whitewater Boating | |
| Whitewater Boating (submittal of revised schedule to FERC) | Article 407 | |
| 05/29/08 | 2008 Preliminary Testing Recommendations (prepared by Cultural Resource Consultants) | Article 401 |
| 05/28/08 | Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (approval from Dept of Ecology) | Low Level Outlet |
| Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (approval from Dept of Ecology) | Pump Station Design | |
| Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (approval from Dept of Ecology) | Reach 4/Tailrace Habitat Enhancement | |
| 05/27/08 | 2008 Archaeological Monitoring Summary (prepared by Cultural Resource Consultants) | Article 401 |
| 05/27/08 | Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (submittal to Dept of Ecology) | Low Level Outlet |
| Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (submittal to Dept of Ecology) | Pump Station Design | |
| Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (submittal to Dept of Ecology) | Reach 4/Tailrace Habitat Enhancement | |
| 05/22/08 | Water Quality Protection Plan | Low Level Outlet |
| Water Quality Protection Plan | Pump Station Design | |
| Water Quality Protection Plan | Reach 4/Tailrace Habitat Enhancement | |
| 05/06/08 | Stehekin Area Implementation Monitoring Plan (order modifying and approval from FERC) | Article 403 |
| 05/02/08 | 2008 1st Quarterly Daily Flow Report | Article 405 |
| 05/02/08 | 2008 1st Quarterly Hourly Flow Report | Article 405 |
| 04/28/08 | 2008 Annual Work Plan (acknowledgement of receipt from FERC) | Article 404 |
| 04/17/08 | 2008 Annual Work Plan (submittal to FERC 2008) | Article 404 |
| 2008 Fish Stocking Report (submittal to FERC) | Article 404 | |
| 04/16/08 | 2007 Annual Flow Report (acknowledgement of receipt from FERC) | Article 405 |
| 04/14/08 | Recreation Resources Management and Implementation Plan (approval from FERC) | Article 407 |
| 04/10/08 | Wildlife Habitat Plan (modifying and approval from FERC) | Article 406 |
| 03/20/08 | Chelan River Projects (time extension granted from FERC) | Article 408 |
| Chelan River Projects (time extension granted from FERC) | Low Level Outlet | |
| Chelan River Projects (time extension granted from FERC) | Pump Station Design | |
| Chelan River Projects (time extension granted from FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 03/01/08 | 2008 Tributary Barriers Photographs | Tributary Barriers |
| 03/01/08 | Archaeological Sites and Resources Monitoring Plan (prepared by Cultural Resources Consultants) | Article 401 |
| 02/28/08 | 2007 Annual Flow Report (submittal to FERC) | Article 405 |
| 02/28/08 | 2007 Annual Flow Report Hourly Data | Article 405 |
| 02/27/08 | 2007 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC) | Article 408 |
| 02/12/08 | Chelan River Projects (time extension request to FERC) | Article 405 |
| Chelan River Projects (time extension request to FERC) | Article 408 | |
| Chelan River Projects (time extension request to FERC) | Low Level Outlet | |
| Chelan River Projects (time extension request to FERC) | Pump Station Design | |
| Chelan River Projects (time extension request to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 01/31/08 | 2007 Annual Implementation and Monitoring Report (submittal to FERC) | Article 408 |
| 01/01/08 | 100% Design Report | Reach 4/Tailrace Habitat Enhancement |
| 12/14/07 | Erosion Control Implementation Plan (approval from FERC) | Article 401 |
| 12/05/07 | 2007 Annual Report of Cultural Activities (submittal letter to FERC) | Article 410 |
| 12/04/07 | Lake Chelan Fishery Plan (order modifying and approval from FERC) | Article 404 |
| 11/30/07 | 90% Design Drawings (submittal to FERC) | Low Level Outlet |
| 90% Design Drawings (submittal to FERC) | Pump Station Design | |
| 90% Design Drawings (submittal to FERC) | Reach 4/Tailrace Habitat Enhancement | |
| 11/30/07 | Operations Compliance Monitoring Plan (order modifying and approval from FERC) | Article 405 |
| 11/30/07 | Quality Assurance Project Plan (order modifying and approval from FERC) | Article 401 |
| 11/28/07 | Threatened and Endangered Species Protection Plan (approval from FERC) | Article 408 |
| 11/27/07 | 2007 Annual Lake Level Report (acknowledgement of receipt from FERC) | Article 405 |
| 11/06/07 | 2007 Annual Lake Level Report (submittal to FERC) | Article 405 |
| 11/06/07 | Erosion Control Implementation Plan (submittal to FERC) | Article 401 |
| 11/06/07 | Erosion Control Monitoring and Maintenance Plan (submittal to FERC) | Article 401 |
| 11/06/07 | Lake Chelan Fishery Plan (submittal to FERC) | Article 404 |
| 11/06/07 | Reach 1 Access Trail (drawing) | Reach 1 Access Trail |
| 11/06/07 | Recreation Resources Management and Implementation Plan (submittal to FERC) | Article 407 |
| 11/06/07 | Riverwalk Loop Trail Extension (drawing) | Riverwalk Loop Trail Extension |
| 11/06/07 | Site Specific Erosion Control Plan (Sites 11, 55, 58, and 59) (submittal to FERC) | Article 401 |
| 11/06/07 | Stehekin Area Implementation Monitoring Plan (submittal to FERC) | Article 403 |
| 11/06/07 | Wildlife Habitat Plan (submittal to FERC) | Article 406 |
| 09/28/07 | 90% Design Drawings | Reach 4/Tailrace Habitat Enhancement |
| 09/18/07 | Chelan River Whitewater Boating Monitoring Study Plan | Article 407 |
| 09/14/07 | Traditional Cultural Properties Management Plan (time extension granted by FERC) | Article 401 |
| 09/04/07 | Bruce Heiner Habitat Photos | Reach 4/Tailrace Habitat Enhancement |
| 08/15/07 | TEE Screen (submittal drawings to FERC) | Pump Station Design |
| 08/01/07 | Traditional Cultural Properties Management Plan (time extension submittal to FERC) | Article 401 |
| 07/30/07 | 60% Design Drawings | Reach 4/Tailrace Habitat Enhancement |
| 07/30/07 | 60% Design Site Construction Specifications | Reach 4/Tailrace Habitat Enhancement |
| 06/05/07 | Reservoir Drawdown Limitation and Saftety Report (acknowledgement of receipt from FERC) | Article 302 |
| 05/16/07 | Lake Chelan Food Web Model Presentation (Washington Cooperative Fish and Wildlife Research Unit) | Lake Chelan Food Web Model |
| 05/04/07 | 30% Design | Reach 4/Tailrace Habitat Enhancement |
| 05/04/07 | 30% Report | Reach 4/Tailrace Habitat Enhancement |
| 05/04/07 | Findings Report | Pump Station Design |
| 05/04/07 | Operations Compliance Monitoring Plan (submittal to FERC) | Article 405 |
| 05/04/07 | Pump Procurement Drawings | Pump Station Design |
| 05/04/07 | Pump Procurement Specifications | Pump Station Design |
| 05/04/07 | Quality Assurance Project Plan (submittal to FERC) | Article 401 |
| 05/04/07 | Technical Specifications | Pump Station Design |
| 05/04/07 | Threatened and Endangered Species Protection Plan (submittal to FERC) | Article 408 |
| 05/01/07 | Chelan River Riparian Planting | Reach 4/Tailrace Habitat Enhancement |
| 01/05/07 | Reservoir Drawdown Limitation and Safety Report (submittal to FERC) | Article 302 |
| 06/06/05 | Study Results | Water Temperature Profile Study |
| Water Temperature Profile Study (Study Results) | ||
| 07/23/04 | Study Plan | Water Temperature Profile Study |
| 12/30/03 | Chelan River Spill Exceedence 1974-2003 | Low Level Outlet |