| 03/03/10 | Whitewater Boating on the Chelan River Monitoring Study (approval from FERC) | Article 407 |
| 02/25/10 | 2009 Annual Lake Level Report (submittal to FERC) | Article 405 |
| 02/01/10 | Predation Impacts of Lake Trout and Chinook salmon in Lake Chelan (final) | Lake Chelan Food Web Model |
| 01/29/10 | 2009 4th Quarter Daily Flow Report | Article 405 |
| 01/29/10 | 2009 4th Quarter Hourly Flow Report | Article 405 |
| 01/25/10 | 2009 Annual Implementation and Monitoring Report (submittal to FERC) | Article 408 |
| 01/22/10 | Annual Lake Level 2008-09 Operating Cycle Report (30-day comment) | Article 405 |
| 01/11/10 | Whitewater Boating on the Chelan River Monitoring Study (submittal to FERC) | Article 407 |
| 12/01/09 | 2009 Lake Chelan Cutthroat Trout Spawning Ground Survey Report (Draft) | Article 404 |
| 11/25/09 | Minimum Flow Deviation for Chelan River - Reach 4 (submittal to FERC) | Article 405 |
| Reach 4/Tailrace Habitat Enhancement | ||
| 11/20/09 | Riparian Zone Action Plan (order granting extension of time from FERC) | Article 403 |
| 10/30/09 | 2009 3rd Quarter Daily Flow Report | Article 405 |
| 10/30/09 | 2009 3rd Quarter Hourly Flow Report | Article 405 |
| 09/15/09 | 2008 Annual Report and 2009 Work Plan (acknowledgement of receipt from FERC) | Article 403 |
| 09/15/09 | Chelan River Project 14th Monthly Report (acknowledgement of receipt) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 08/20/09 | Lake Chelan Tributary Passage Final Design | Tributary Barriers |
| 08/14/09 | Chelan River Project 12th and 13th Monthly Reports (acknowledgement of receipt from FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 08/14/09 | Chelan River Project 14th Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 08/14/09 | Reach 1 Access Trail Final Construction Report (acknowledgement of receipt from FERC) | Reach 1 Access Trail |
| 08/13/09 | Riparian Zone Action Plan (time extension request submittal to FERC) | Article 403 |
| 07/31/09 | 2009 2nd Quarterly Daily Flow Report | Article 405 |
| 07/31/09 | 2009 2nd Quarterly Hourly Flow Report | Article 405 |
| 07/15/09 | Chelan River Project 13th Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 07/07/09 | 2009 Whitewater Boating Monitoring Study Revised Schedule (submittal to FERC) | Whitewater Boating |
| 06/26/09 | Lake Chelan Tributary Passage Preliminary Design | Tributary Barriers |
| 06/17/09 | Chelan River Project 11th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 06/12/09 | Chelan River Project 12th Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 05/14/09 | Chelan River Project 11th Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 05/08/09 | 1st Quarter Report - Mitchelle Creek Campground (draft report) | Article 401 |
| 05/04/09 | Riverwalk Loop Trail Extension Contract Plans and Specifications (acknowledgement of receipt from FERC) | Riverwalk Loop Trail Extension |
| 04/30/09 | 2008 Annual Winter Survey (submittal to FERC) | Article 406 |
| 04/27/09 | Wildlife Habitat Plan-2008 Activity Report and 2009 Work Plan (submittal to FERC) | Article 406 |
| 04/14/09 | Chelan River Project 10th Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 04/10/09 | Chelan River Project 9th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 04/09/09 | Chelan River Project 8th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 04/02/09 | Lake Chelan Tributary Field Trip | Tributary Barriers |
| 03/31/09 | 2009 1st Quarterly Daily Flow Report | Article 405 |
| 03/31/09 | 2009 1st Quarterly Hourly Flow Report | Article 405 |
| 03/26/09 | 2008 Annual Flow Report (acknowledgement of receipt from FERC) | Article 405 |
| Article 405 | ||
| 03/26/09 | 2009 Annual Work Plan (acknowledgement of receipt from FERC) | Article 404 |
| 03/25/09 | 2008 Annual Report and 2009 Work Plan (submittal to FERC) | Article 403 |
| 03/13/09 | Chelan River Project 9th Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 02/27/09 | 2008 Annual Flow Report (submittal to FERC) | Article 405 |
| 02/27/09 | 2008 Annual Lake Level Report (submittal to FERC) | Article 405 |
| 02/27/09 | Final Construction Report and As-built (submittal to FERC) | Reach 1 Access Trail |
| 02/24/09 | 2008 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC) | Article 408 |
| 02/17/09 | 2009 Annual Work Plan (submittal to FERC) | Article 404 |
| 02/13/09 | Chelan River Project 8th Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 02/05/09 | 2009 Hydropower Development Recreation Report-Form 80 (submittal to FERC) | Article 407 |
| 02/01/09 | Tributary Mouth Photographs 2009 | Tributary Barriers |
| 01/30/09 | 2008 4th Quarterly Daily Flow Report | Article 405 |
| 01/30/09 | 2008 4th Quarterly Hourly Flow Report | Article 405 |
| 01/30/09 | Chelan River Project 7th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 01/29/09 | 2008 Annual Implementation and Monitoring Report (submittal to FERC) | Article 408 |
| 01/29/09 | Riverwalk Loop Trail Extension Contract Plans and Specifications (submittal to FERC) | Riverwalk Loop Trail Extension |
| 01/27/09 | 2007 and 2008 Annnual Cultrual Activities Reports (acknowledgement of receipt from FERC) | Article 410 |
| 01/26/09 | Chelan River Project 6th Monthly Report (acknowledgement of receipt from FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 01/14/09 | Chelan River Project 7th Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 01/01/09 | Lake Chelan Kokanee Spawning Ground Surveys 2008 Final Report | Miscellaneous Activities |
| 12/31/08 | Lake Chelan Winter Wildlife Status Report Winter 2007-2008 (annual wildlife winter survey DRAFT report) | Article 406 |
| 12/18/08 | WDFW kokanee Management Plan (DRAFT) | Miscellaneous Activities |
| 12/15/08 | Chelan River Project Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 12/05/08 | 2008 Annual Report of Cultural Activities (submittal letter to FERC) | Article 410 |
| 11/14/08 | Chelan River Project Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 11/05/08 | Tailrace-spawning Habitat | Reach 4/Tailrace Habitat Enhancement |
| 10/15/08 | Chelan River Project Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 10/02/08 | Traditional Cultural Properties Management Plan (second time extension granted by FERC) | Article 401 |
| 09/30/08 | 2008 3rd Quarterly Daily Flow Report | Article 405 |
| 09/30/08 | 2008 3rd Quarterly Hourly Report | Article 405 |
| 09/24/08 | Chelan Ranger District Large Fire History 2000-2007 | Tributary Barriers |
| 09/15/08 | Traditional Cultural Properties Management Plan (second time extension request to FERC) | Article 401 |
| 09/12/08 | Chelan River Project Montly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 09/02/08 | Reach 1 Access Trail (order granting time extension for construction from FERC) | Reach 1 Access Trail |
| Whitewater Boating | ||
| 09/01/08 | Stehekin River kokanee photographs (WDFW) | Miscellaneous Activities |
| 08/21/08 | Reach 1 Trail (authorization to begin construction granted from FERC) | Reach 1 Access Trail |
| 08/15/08 | Chelan River Project Monthly Report (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 1 Access Trail | ||
| 07/28/08 | Little Creek Photos | Tributary Barriers |
| 06/30/08 | 2008 2nd Quarterly Daily Flow Report | Article 405 |
| 06/30/08 | 2008 2nd Quarterly Hourly Flow Report | Article 405 |
| 06/06/08 | Riverwalk Loop Trail Extension (request for specifications and revised construction schedule submitted to FERC) | Riverwalk Loop Trail Extension |
| Reach 1 Access Trail | ||
| Whitewater Boating | ||
| 05/27/08 | Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) | Low Level Outlet |
| Pump Station Design | ||
| Reach 4/Tailrace Habitat Enhancement | ||
| 05/22/08 | Water Quality Protection Plan | Low Level Outlet |
| Pump Station Design | ||
| Reach 4/Tailrace Habitat Enhancement | ||
| 05/06/08 | Stehekin Area Implementation Monitoring Plan (order modifying and approval from FERC) | Article 403 |
| 04/28/08 | 2008 Annual Work Plan (acknowledgement of receipt from FERC) | Article 404 |
| 04/17/08 | 2008 Annual Work Plan (submittal to FERC 2008) | Article 404 |
| 04/16/08 | 2007 Annual Flow Report (acknowledgement of receipt from FERC) | Article 405 |
| 04/14/08 | Recreation Resources Management and Implementation Plan (approval from FERC) | Article 407 |
| 04/10/08 | Wildlife Habitat Plan (modifying and approval from FERC) | Article 406 |
| 03/30/08 | 2008 1st Quarterly Daily Flow Report | Article 405 |
| 03/30/08 | 2008 1st Quarterly Hourly Flow Report | Article 405 |
| 03/20/08 | Chelan River Projects (time extension granted from FERC) | Article 408 |
| Low Level Outlet | ||
| Pump Station Design | ||
| Reach 4/Tailrace Habitat Enhancement | ||
| 03/01/08 | Tributary Barriers Photographs | Tributary Barriers |
| 02/28/08 | 2007 Annual Flow Report (submittal to FERC) | Article 405 |
| 02/28/08 | 2007 Annual Flow Report Hourly Data | Article 405 |
| 02/27/08 | 2007 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC) | Article 408 |
| 02/12/08 | Chelan River Projects (time extension request) | Article 408 |
| Low Level Outlet | ||
| Pump Station Design | ||
| Reach 4/Tailrace Habitat Enhancement | ||
| 01/31/08 | 2007 Annual Implementation and Monitoring Report (submittal to FERC) | Article 408 |
| 12/14/07 | Erosion Control Implementation Plan (approval from FERC) | Article 401 |
| 12/05/07 | 2007 Annual Report of Cultural Activities (submittal letter to FERC) | Article 410 |
| 12/04/07 | Lake Chelan Fishery Plan (order modifying and approval from FERC) | Article 404 |
| 11/30/07 | 90% Design Drawings (submittal to FERC) | Low Level Outlet |
| Pump Station Design | ||
| Reach 4/Tailrace Habitat Enhancement | ||
| 11/30/07 | Operations Compliance Monitoring Plan (order modifying and approval from FERC) | Article 405 |
| 11/28/07 | Threatened and Endangered Species Protection Plan (approval from FERC) | Article 408 |
| 11/27/07 | 2007 Annual Lake Level Report (acknowledgement of receipt from FERC) | Article 405 |
| 11/06/07 | 2007 Annual Lake Level Report (submittal to FERC) | Article 405 |
| 11/06/07 | Erosion Control Implementation Plan (submittal to FERC) | Article 401 |
| 11/06/07 | Erosion Control Monitoring and Maintenance Plan (submittal to FERC) | Article 401 |
| 11/06/07 | Lake Chelan Fishery Plan (submittal to FERC) | Article 404 |
| 11/06/07 | Reach 1 Access Trail (drawing) | Reach 1 Access Trail |
| 11/06/07 | Recreation Resources Management and Implementation Plan (submittal to FERC) | Article 407 |
| 11/06/07 | Riverwalk Loop Trail Extension (drawing) | Riverwalk Loop Trail Extension |
| 11/06/07 | Site Specific Erosion Control Plan (submittal to FERC) | Article 401 |
| 11/06/07 | Stehekin Area Implementation Monitoring Plan (submittal to FERC) | Article 403 |
| 11/06/07 | Wildlife Habitat Plan (submittal to FERC) | Article 406 |
| 09/28/07 | 90% Design Drawings | Reach 4/Tailrace Habitat Enhancement |
| 09/18/07 | Chelan River Whitewater Boating Monitoring Study Plan | Article 407 |
| 09/14/07 | Traditional Cultural Properties Management Plan (time extension granted by FERC) | Article 401 |
| 09/04/07 | Bruce Heiner Habitat Photos | Reach 4/Tailrace Habitat Enhancement |
| 08/15/07 | TEE Screen (submittal drawings to FERC) | Pump Station Design |
| 08/08/07 | Lake Chelan Fish Salvage and Snorkel Survey | Miscellaneous Activities |
| 08/01/07 | Traditional Cultural Properties Management Plan (time extension submittal to FERC) | Article 401 |
| 07/30/07 | 60% Design Drawings | Reach 4/Tailrace Habitat Enhancement |
| 07/30/07 | 60% Design Report | Low Level Outlet |
| 07/30/07 | 60% Design Site Construction Specifications | Reach 4/Tailrace Habitat Enhancement |
| 05/16/07 | Lake Chelan Food Web Model Presentation | Lake Chelan Food Web Model |
| 05/04/07 | 30% Design | Pump Station Design |
| 05/04/07 | 30% Report | Pump Station Design |
| 05/04/07 | Findings Report | Pump Station Design |
| 05/04/07 | Operations Compliance Monitoring Plan (submittal to FERC) | Article 405 |
| 05/04/07 | Pump Procurement Drawings | Pump Station Design |
| 05/04/07 | Pump Procurement Specifications | Pump Station Design |
| 05/04/07 | Technical Specifications | Pump Station Design |
| 05/04/07 | Threatened and Endangered Species Protection Plan (submittal to FERC) | Article 408 |
| 05/01/07 | Chelan River Riparian Planting | Reach 4/Tailrace Habitat Enhancement |
| 06/06/05 | Study Results | Water Temperature Profile Study |
| 07/23/04 | Study Plan | Water Temperature Profile Study |
| 12/30/03 | Chelan River Spill Exceedence 1974-2003 | Low Level Outlet |