Implementation Home.

Licensing and Compliance Resource Documents

Datesorted in descending order Document Article

Showing records 1 thru 401 of 401 records.
01/01/50  Monitoring and Evaluation (summary of all activities)   Monitoring and Evaluation Activities 
05/15/13  2013 Annual Work Plan (submittal to FERC)   Article 404 
  2013 Fish Stocking Report (submittal to FERC)   Article 404 
05/02/13  Errata Notice-Order Approving Revised Historic Properties Management Plan (FERC's correction of filing date)   Article 401 
04/30/13  2012 Annual Flow and Water Temperature Report (submittal to FERC)   Article 405 
04/30/13  2012 Annual Report (submittal to FERC)   Article 403 
04/30/13  2012-2013 Winter Wildlife Survey Report (submittal to FERC)   Article 406 
04/30/13  2013 Biological Objectives Status Report (submittal to FERC)   Article 401 
  2013 Biological Objectives Status Report (submittal to FERC)   Article 408 
04/30/13  2013 Stehekin Work Plan (submittal to FERC)   Article 403 
04/25/13  Traditional Cultural Properties Management Plan, Revised (approval from FERC)   Article 401 
04/18/13  Minimum Flow and Ramping Rate Deviation Report (March 18, 2013) (submittal to FERC)   Article 405 
04/10/13  2008-2012 Wildlife Activity Report and 2013-2017 Wildlife Work Plan (submittal to FERC)   Article 406 
  2013-2017 Wildlife Work Plan and 2008-2012 Wildlife Activity Report (submittal to FERC)   Article 406 
03/20/13  Minimum Flow and Ramping Rate Deviation Report (March 18, 2013) (Chelan PUD email notification)   Article 405 
02/28/13  2012 Annual Lake Level Report (submittal to FERC)   Article 405 
01/01/13  2012 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD)   Monitoring and Evaluation Activities 
12/31/12  2012 4th Quarter Daily Flow Report   Article 405 
12/31/12  2012 4th Quarter Hourly Flow Report   Article 405 
12/31/12  2012 Chelan River Daily Temperature Report - 4th Quarter   Appendix D 
12/31/12  2012 Chelan River Hourly Temperature Report - 4th Quarter   Appendix D 
11/23/12  2012 Annual Cultural Activities Report (submittal to FERC)   Article 410 
10/24/12  Traditional Cultural Properties Management Plan, Revised (submittal to FERC)   Article 401 
09/28/12  2012 3rd Quarter Daily Flow Report   Article 405 
09/28/12  2012 3rd Quarter Hourly Flow Report   Article 405 
09/28/12  2012 Chelan River Daily Temperature Report - 3rd Quarter   Appendix D 
09/28/12  2012 Chelan River Hourly Temperature Report - 3rd Quarter   Appendix D 
07/16/12  2011 Whitewater Monitoring Study (approval from FERC)   Article 407 
  Recreation Resources Management and Implementation Plan Amendment (approval from FERC)   Article 407 
06/29/12  2012 2nd Quarter Daily Flow Report   Article 405 
06/29/12  2012 2nd Quarter Hourly Flow Report   Article 405 
06/29/12  2012 Chelan River Daily Temperature Report - 2nd Quarter   Appendix D 
06/29/12  2012 Chelan River Hourly Temperature Report - 2nd Quarter   Appendix D 
06/25/12  2009-2011 Lower Stehekin River Cutthroat and Rainbow Trout Spawning Surveys (National Park Service)   Monitoring and Evaluation Activities 
05/10/12  2012 Annual Work Plan (submittal to FERC)   Article 404 
  2012 Fish Stocking Report (submittal to FERC)   Article 404 
05/01/12  2009-2011 Whitewater Monitoring Study (submittal to FERC)   Article 407 
  2009-2011 Whitewater Monitoring Study (submittal to FERC)   Whitewater Boating 
04/26/12  2011-2012 Winter Wildlife Survey Report (submittal to FERC)   Article 406 
04/24/12  2011 Activity Report and2012 Work Plan (submittal to FERC)   Article 406 
  2012 Wildlife Work Plan and 2011 Activity Report (submittal to FERC)   Article 406 
04/06/12  2011 Annual Report (submittal to FERC)   Article 403 
  2012 Stehekin Work Plan (submittal to FERC)   Article 403 
03/30/12  2012 1st Quarter Daily Flow Report   Article 405 
03/30/12  2012 1st Quarter Hourly Flow Report   Article 405 
03/30/12  2012 Chelan River Daily Temperature Report - 1st Quarter   Appendix D 
03/30/12  2012 Chelan River Hourly Temperature Report - 1st Quarter   Appendix D 
03/28/12  2011 Annual Flow and Water Temperature Report (submittal to FERC)   Article 405 
02/28/12  2011 Annual Lake Level Report (submittal to FERC)   Article 405 
02/24/12  2011 Annual Flow and Water Temperature Report (time extension request granted)   Article 405 
02/15/12  2011 Chelan River Daily and Hourly Temperature Report - 2011 September, 3rd Quarter, and 4th Quarter   Appendix D 
02/03/12  2011 Annual Flow and Water Temperature Report (request for time extension)   Article 405 
02/01/12  2011 4th Quarter Hourly and Daily Flow Report   Article 405 
01/31/12  2011 Annual Implementation and Monitoring Report (submittal to FERC)   Article 408 
01/11/12  Stehekin Area Dust Emissions 5-year Report (approval from FERC)   Article 403 
01/02/12  2011 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD)   Monitoring and Evaluation Activities 
12/08/11  Traditional Cultural Properties Management Plan (approval from FERC)   Article 401 
12/02/11  2011 Annual Cultural Activities Report (submittal to FERC)   Article 410 
12/01/11  2011 Archaeologica Monitoring Report (prepared by Cultural Resource Consultants)   Article 401 
11/03/11  Stehekin Area Dust Emissions 5-year Report (submittal to FERC)   Article 403 
10/31/11  2011 3rd Quarter Daily Flow Report   Article 405 
10/31/11  2011 3rd Quarter Hourly Flow Report   Article 405 
10/21/11  Minimum Flow and Ramping Rate Deviations (May 15 and 17, 2001) (response from FERC)   Article 405 
10/11/11  Traditional Cultural Properties Management Plan (submittal to FERC)   Article 401 
09/30/11  2011 Chelan River Daily Temperature Report - August   Appendix D 
09/30/11  2011 Chelan River Hourly Temperature Report - August   Appendix D 
09/29/11  Lake Level Target Deviation (May 1, 2011 and June 1, 2011) (response from FERC)   Article 405 
09/28/11  Minimum Flow and Ramping Rate Deviation (April 18, 2011) (response from FERC)   Article 405 
08/29/11  Lake Chelan Mule Deer and Big Horn Sheep Winter Range Habitat (Cascadia Conservation District)   Article 406 
08/02/11  Stehekin Riparian Zone Plan (approval from FERC)   Article 403 
07/31/11  2011 Chelan River Daily Temperature Report - July   Appendix D 
07/31/11  2011 Chelan River Hourly Temperature Report - July   Appendix D 
07/27/11  2011 Whitewater Boating Monitoring Study Revised Schedule (submittal to FERC)   Article 407 
  2011 Whitewater Boating Monitoring Study Revised Schedule (submittal to FERC)   Whitewater Boating 
06/30/11  2011 2nd Quarter Daily Flow Report   Article 405 
06/30/11  2011 2nd Quarter Hourly Flow Report   Article 405 
06/30/11  2011 Annual Work Plan (acknowledgement of receipt from FERC)   Article 404 
06/30/11  2011 Chelan River Daily Temperature Report - 2nd Quarter   Appendix D 
06/30/11  2011 Chelan River Hourly Temperature Report - 2nd Quarter   Appendix D 
06/29/11  Lake Level Target Deviation Report (June 1, 2011) (submittal to FERC)   Article 405 
06/16/11  Minimum Flow and Ramping Rate Deviation Report (May 15 and 17, 2011) (submittal to FERC)   Article 405 
06/02/11  Lake Level Target Deviation Notice (June 1, 2011) (Chelan PUD email notification)   Article 405 
06/01/11  2011 Annual Work Plan (submittal to FERC)   Article 404 
  2011 Fish Stocking Report (submittal to FERC)   Article 404 
05/31/11  Lake Level Target Deviation Report (May 1, 2011) (submittal to FERC)   Article 405 
05/25/11  2011 Tributary Barriers Photographs   Tributary Barriers 
05/19/11  Minimum Flow and Ramping Rate Deviation Notice (May 15 and 17, 2011) (Chelan PUD email notification)   Article 405 
05/19/11  Minimum Flow and Ramping Rate Deviation Report (April 18, 2011) (submittal to FERC)   Article 405 
05/18/11  Minimum Flow and Ramping Rate Deviation (April 18, 2011) (submittal to FERC)   Article 405 
05/10/11  Traditional Cultural Properties Management Plan (third request for extension of time granted by FERC)   Article 401 
05/02/11  Lake Level Target Devviation Notice (May 1, 2011) (Chelan PUD email notification)   Article 405 
04/29/11  2010 Activity Report and 2011 Wildlife Work Plan (submittal to FERC)   Article 406 
04/29/11  2010 Annual Report (submittal to FERC)   Article 403 
04/29/11  2010-2011 Winter Wildlife Survey Report (submittal to FERC)   Article 406 
04/29/11  2011 Stehekin Work Plan (submittal to FERC)   Article 403 
04/29/11  2011 Wildlife Work Plan and 2010 Activity Report (submittal to FERC)   Article 406 
04/22/11  2011 1st Quarter Daily Flow Report   Article 405 
04/22/11  2011 1st Quarter Hourly Flow Report   Article 405 
04/22/11  2011 Chelan River Daily Temperature Report - 1st Quarter   Appendix D 
04/22/11  2011 Chelan River Hourly Temperature Report - 1st Quarter   Appendix D 
04/21/11  2010 Annual Lake Level Report (acknowledgement of receipt from FERC)   Article 405 
04/20/11  Minimum Flow and Ramping Rate Deviation Notice (April 18, 2011) (Chelan PUD email notification)   Article 405 
03/04/11  2010 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC)   Article 408 
02/28/11  2010 Annual Flow and Water Temperature Report (submittal to FERC)   Article 405 
02/28/11  2010 Annual Lake Level Report (submittal to FERC)   Article 405 
02/04/11  Erosion Sites 24, 25, 26, 27 (order granting a revised schedule from FERC)   Article 401 
01/31/11  2010 4th Quarter Daily Flow Report   Article 405 
01/31/11  2010 4th Quarter Hourly Flow Report   Article 405 
01/31/11  2010 Whitewater Monitoring Study (approval from FERC)   Article 407 
01/21/11  2010 Annual Implementation and Monitoring Report (submittal to FERC)   Article 408 
01/21/11  2010 Whitewater Monitoring Study (submittal to FERC)   Article 407 
01/13/11  2010 Annual Cultural Activities Report (approval from FERC)   Article 410 
12/31/10  2010 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD)   Monitoring and Evaluation Activities 
12/17/10  Erosion Sites 24, 25, 26, 27 (notification of revised schedule)   Article 401 
12/06/10  2010 Annual Cultural Activities Report (submittal to FERC)   Article 410 
11/29/10  2009 Lower Stehekin River Cutthroat and Rainbow Trout Spawing Surveys (National Park Service)   Monitoring and Evaluation Activities 
11/17/10  Chelan River Implementation Monitoring Report (acknowledgement of receipt from FERC (second))   Article 408 
11/15/10  2010 Whitewater Boating Monitoring Study (approval of revised schedule from FERC)   Article 407 
  2010 Whitewater Boating Monitoring Study (approval of revised schedule from FERC)   Whitewater Boating 
11/08/10  Reach 1 Trail Extension As-built (submittal to FERC)   Reach 1 Access Trail 
  Reach 1 Trail Extension As-built (submittal to FERC)   Riverwalk Loop Trail Extension 
11/08/10  Traditional Cultural Properties Management Plan (request for third extension of time submittal to FERC)   Article 401 
11/01/10  Stehekin Riparian Zone Plan (submittal to FERC)   Article 403 
10/29/10  2010 3rd Quarter Daily Flow Report   Article 405 
10/29/10  2010 3rd Quarter Hourly Flow Report   Article 405 
10/29/10  2010 Chelan River Daily Temperature Report - 3rd Quarter   Appendix D 
10/29/10  2010 Chelan River Daily Temperature Report - September   Appendix D 
10/29/10  2010 Chelan River Hourly Temperature Report - 3rd Quarter   Appendix D 
10/29/10  2010 Chelan River Hourly Temperature Report - September   Appendix D 
09/30/10  2010 Chelan River Daily Temperature Report - August   Appendix D 
09/30/10  2010 Chelan River Hourly Temperature Report - August   Appendix D 
09/16/10  Chelan River Implementation Monitoring Report (acknowledgement of receipt from FERC)   Article 408 
08/31/10  2010 Chelan River Daily Temperature Report - July   Appendix D 
08/31/10  2010 Chelan River Hourly Temperature Report - July   Appendix D 
08/12/10  Chelan River Implementation Monitoring Report (submittal to FERC and National Marine Fisheries Service)   Article 408 
07/30/10  2010 Chelan River Daily Temperture Report-2nd Quarter   Appendix D 
07/30/10  2010 Chelan River Hourly Temperature Report-2nd Quarter   Appendix D 
07/29/10  2010 2nd Quarter Daily Flow Report   Article 405 
07/29/10  2010 2nd Quarter Hourly Flow Report   Article 405 
07/22/10  2010 Annual Work Plan (acknowledgement of receipt from FERC)   Article 404 
07/08/10  2009 Annual Flow Report (acknowledgement of receipt from FERC)   Article 405 
07/08/10  2009 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC)   Article 408 
07/08/10  2009 Annual Lake Level Report (acknowledgement of receipt from FERC)   Article 405 
07/08/10  Implementation Monitoring Report Revised Schedule (acknowledgement of receipt from FERC)   Article 408 
07/07/10  2010 Whitewater Boating Monitoring Study (submittal of revised schedule to FERC)   Article 407 
  2010 Whitewater Boating Monitoring Study (submittal of revised schedule to FERC)   Whitewater Boating 
06/08/10  2009 Annual Winter Survey and 2009 Wildlife Activity Report (acknowledgement of receipt from FERC)   Article 406 
  2010 Wildlife Work Plan (acknowledgement of receipt from FERC)   Article 406 
05/31/10  2010 Archaeological Monitoring Report (prepared by Cultural Resource Consultants)   Article 401 
05/27/10  2010 Annual Work Plan (submittal to FERC)   Article 404 
  2010 Fish Stocking Report (submittal to FERC)   Article 404 
05/19/10  Biological Objectives Status Reports (approval of Revised Schedule from FERC)   Article 401 
  Biological Objectives Status Reports (approval of Revised Schedule from FERC)   Article 408 
05/03/10  Implementation Monitoring Report Revised Schedule (submittal to FERC and National Marine Fisheries Service)   Article 408 
04/30/10  2009 Wildlife Activity Report (submittal to FERC)   Article 406 
04/30/10  2009-2010 Winter Wildlife Survey (submittal to FERC)   Article 406 
04/30/10  2010 Wildlife Work Plan (submittal to FERC)   Article 406 
04/28/10  2010 1st Quarter Daily Flow Report   Article 405 
04/28/10  2010 1st Quarter Hourly Flow Report   Article 405 
04/08/10  2009 Annual Report (submittal to FERC)   Article 403 
04/08/10  2009 Archaeological Monitoring Report (prepared by Cultural Resource Consultants)   Article 401 
04/08/10  2010 Stehekin Work Plan (submittal to FERC)   Article 403 
03/31/10  2010 Chelan River Daily Temperature Report-1st Quarter   Appendix D 
03/31/10  2010 Chelan River Hourly Temperature Report-1st Quarter   Appendix D 
03/30/10  Chelan River Project Final Report (acknowledgement of receipt from FERC)   Low Level Outlet 
  Chelan River Project Final Report (acknowledgement of receipt from FERC)   Pump Station Design 
  Chelan River Project Final Report (acknowledgement of receipt from FERC)   Reach 4/Tailrace Habitat Enhancement 
03/29/10  Cultural Resources Interpretive and Education Program (approval from FERC)   Article 401 
03/29/10  Site Specific Erosion Control Plan (Sites 24, 25, 26, and 27) (approval from FERC)   Article 401 
03/12/10  Erosion Control Report-Corral and Prince Creek (Sites 11 and 55)   Article 401 
03/09/10  Biological Objectives Status Reports (submittal of Revised Schedule to FERC)   Article 401 
  Biological Objectives Status Reports (submittal of Revised Schedule to FERC)   Article 408 
03/03/10  2009 Whitewater Boating on the Chelan River Monitoring Study (approval from FERC)   Article 407 
02/26/10  2009 Annual Flow Report (submittal to FERC)   Article 405 
02/25/10  2009 Annual Lake Level Report (submittal to FERC)   Article 405 
02/01/10  Predation Impacts of Lake Trout and Chinook Salmon in Lake Chelan (Washington Cooperative Fish and Wildlife Research Unit)   Lake Chelan Food Web Model 
01/29/10  2009 4th Quarter Daily Flow Report   Article 405 
01/29/10  2009 4th Quarter Hourly Flow Report   Article 405 
01/28/10  Chelan River Project Final Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project Final Report (submittal to FERC)   Pump Station Design 
  Chelan River Project Final Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
01/25/10  2009 Annual Implementation and Monitoring Report (submittal to FERC)   Article 408 
01/14/10  Minimum Flow Deviation (October 24 - 26, 2009) (response from FERC)   Article 405 
01/11/10  2009 Whitewater Boating on the Chelan River Monitoring Study (submittal to FERC)   Article 407 
12/31/09  2009 Chelan River Daily Temperature Report-4th Quarter   Appendix D 
12/31/09  2009 Chelan River Hourly Temperature Report-4th Quarter   Appendix D 
12/31/09  2009 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD)   Monitoring and Evaluation Activities 
12/09/09  2009 Annual Cultural Activities Report (approval from FERC)   Article 410 
12/03/09  2009 Annual Cultural Activities Report (submittal to FERC)   Article 410 
12/01/09  2009 Lake Chelan Cutthroat Trout Spawning Ground Survey Report (US Department of Agriculture-Forest Service)   Monitoring and Evaluation Activities 
11/25/09  Minimum Flow Deviation Report (October 24-26, 2009) (submittal to FERC)   Article 405 
11/20/09  Riparian Zone Action Plan (order granting extension of time from FERC)   Article 403 
11/18/09  Site Specific Erosion Control Plan (Sites 24, 25, 26, and 27) (submittal to FERC)   Article 401 
10/30/09  2009 3rd Quarter Daily Flow Report   Article 405 
10/30/09  2009 3rd Quarter Hourly Flow Report   Article 405 
10/30/09  Cultural Resources Interpretive and Education Program (submittal to FERC)   Article 401 
10/28/09  Minimum Flow Deviation Notice (October 24-26, 2009) (Chelan PUD email notification)   Article 405 
10/02/09  2008 Annual Winter Survey (acknowledgement of receipt from FERC)   Article 406 
  2008 Wildlife Activity Report (acknowledgement of receipt from FERC)   Article 406 
  2009 Wildlife Work Plan (acknowledgement of receipt from FERC)   Article 406 
09/15/09  2008 Annual Report (acknowledgement of receipt from FERC)   Article 403 
  2009 Work Plan (acknowledgement of receipt from FERC)   Article 403 
09/15/09  Chelan River Project 14th Monthly Report (acknowledgement of receipt from FERC)   Low Level Outlet 
  Chelan River Project 14th Monthly Report (acknowledgement of receipt from FERC)   Pump Station Design 
  Chelan River Project 14th Monthly Report (acknowledgement of receipt from FERC)   Reach 4/Tailrace Habitat Enhancement 
08/20/09  Lake Chelan Tributary Passage Final Design   Tributary Barriers 
08/14/09  Chelan River Project 12th and 13th Monthly Reports (acknowledgement of receipt from FERC)   Low Level Outlet 
  Chelan River Project 12th and 13th Monthly Reports (acknowledgement of receipt from FERC)   Pump Station Design 
  Chelan River Project 12th and 13th Monthly Reports (acknowledgement of receipt from FERC)   Reach 4/Tailrace Habitat Enhancement 
08/14/09  Chelan River Project 14th Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project 14th Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project 14th Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
08/14/09  Reach 1 Access Trail Final Construction Report (acknowledgement of receipt from FERC)   Reach 1 Access Trail 
08/13/09  Riparian Zone Action Plan (time extension request submittal to FERC)   Article 403 
07/31/09  2009 2nd Quarterly Daily Flow Report   Article 405 
07/31/09  2009 2nd Quarterly Hourly Flow Report   Article 405 
07/15/09  Chelan River Project 13th Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project 13th Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project 13th Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
07/07/09  2009 Whitewater Boating Monitoring Study Revised Schedule (submittal to FERC)   Article 407 
  2009 Whitewater Boating Monitoring Study Revised Schedule (submittal to FERC)   Whitewater Boating 
06/26/09  Lake Chelan Tributary Passage Preliminary Design   Tributary Barriers 
06/17/09  Chelan River Project 11th Monthly Report (acknowledgement of receipt from FERC)   Low Level Outlet 
  Chelan River Project 11th Monthly Report (acknowledgement of receipt from FERC)   Pump Station Design 
  Chelan River Project 11th Monthly Report (acknowledgement of receipt from FERC)   Reach 4/Tailrace Habitat Enhancement 
06/12/09  Chelan River Project 12th Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project 12th Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project 12th Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
05/14/09  Chelan River Project 11th Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project 11th Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project 11th Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
05/04/09  Riverwalk Loop Trail Extension Contract Plans and Specifications (acknowledgement of receipt from FERC)   Riverwalk Loop Trail Extension 
04/30/09  2008-2009 Winter Wildlife Survey (submittal to FERC)   Article 406 
04/27/09  2008 Wildlife Activity Report (submittal to FERC)   Article 406 
  2009 Wildlife Work Plan (submittal to FERC)   Article 406 
04/22/09  Erosion Control Treatment- Deer Point Campground (Site 58)   Article 401 
04/14/09  Chelan River Project 10th Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project 10th Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project 10th Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
04/10/09  Chelan River Project 9th Monthly Report (acknowledgement of receipt from FERC)   Low Level Outlet 
  Chelan River Project 9th Monthly Report (acknowledgement of receipt from FERC)   Pump Station Design 
  Chelan River Project 9th Monthly Report (acknowledgement of receipt from FERC)   Reach 4/Tailrace Habitat Enhancement 
04/09/09  Chelan River Project 8th Monthly Report (acknowledgement of receipt from FERC)   Low Level Outlet 
  Chelan River Project 8th Monthly Report (acknowledgement of receipt from FERC)   Pump Station Design 
  Chelan River Project 8th Monthly Report (acknowledgement of receipt from FERC)   Reach 4/Tailrace Habitat Enhancement 
04/08/09  1st Quarter Report - Mitchelle Creek Campground (Site 59) (draft report)   Article 401 
04/02/09  Lake Chelan Tributary Field Trip   Tributary Barriers 
03/31/09  2009 1st Quarterly Daily Flow Report   Article 405 
03/31/09  2009 1st Quarterly Hourly Flow Report   Article 405 
03/26/09  2008 Annual Flow Report (acknowledgement of receipt from FERC)   Article 405 
  2008 Annual Lake Level Report (acknowledgement of receipt from FERC)   Article 405 
03/26/09  2009 Annual Work Plan (acknowledgement of receipt from FERC)   Article 404 
03/25/09  2008 Annual Report (submittal to FERC)   Article 403 
  2009 Work Plan (submittal to FERC)   Article 403 
03/13/09  Chelan River Project 9th Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project 9th Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project 9th Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
02/27/09  2008 Annual Flow Report (submittal to FERC)   Article 405 
02/27/09  2008 Annual Lake Level Report (submittal to FERC)   Article 405 
02/27/09  Final Construction Report and As-built (submittal to FERC)   Reach 1 Access Trail 
02/24/09  2008 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC)   Article 408 
02/17/09  2009 Annual Work Plan (submittal to FERC)   Article 404 
  2009 Fish Stocking Report (submittal to FERC)   Article 404 
02/13/09  Chelan River Project 8th Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project 8th Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project 8th Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
02/05/09  2009 Hydropower Development Recreation Report-Form 80 (submittal to FERC)   Article 407 
02/01/09  2009 Tributary Mouth Photographs   Tributary Barriers 
01/30/09  2008 4th Quarterly Daily Flow Report   Article 405 
01/30/09  2008 4th Quarterly Hourly Flow Report   Article 405 
01/30/09  Chelan River Project 7th Monthly Report (acknowledgement of receipt from FERC)   Low Level Outlet 
  Chelan River Project 7th Monthly Report (acknowledgement of receipt from FERC)   Pump Station Design 
  Chelan River Project 7th Monthly Report (acknowledgement of receipt from FERC)   Reach 4/Tailrace Habitat Enhancement 
01/29/09  2008 Annual Implementation and Monitoring Report (submittal to FERC)   Article 408 
01/29/09  Riverwalk Loop Trail Extension Contract Plans and Specifications (submittal to FERC)   Riverwalk Loop Trail Extension 
01/27/09  2007 and 2008 Annnual Cultural Activities Reports (acknowledgement of receipt from FERC)   Article 410 
01/26/09  Chelan River Project 6th Monthly Report (acknowledgement of receipt from FERC)   Low Level Outlet 
  Chelan River Project 6th Monthly Report (acknowledgement of receipt from FERC)   Pump Station Design 
  Chelan River Project 6th Monthly Report (acknowledgement of receipt from FERC)   Reach 4/Tailrace Habitat Enhancement 
01/14/09  Chelan River Project 7th Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project 7th Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project 7th Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
12/31/08  2007-2008 Winter Wildlife Report   Article 406 
12/31/08  2008 Lake Chelan Kokanee Spawning Ground Surveys (Chelan PUD)   Monitoring and Evaluation Activities 
12/18/08  Lake Chelan Kokanee Management Plan (Washington Department of Fish and Wildlife)   Article 404 
12/15/08  Chelan River Project Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
12/05/08  2008 Annual Report of Cultural Activities (submittal letter to FERC)   Article 410 
11/14/08  Chelan River Project Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
11/05/08  Tailrace-spawning Habitat   Reach 4/Tailrace Habitat Enhancement 
10/15/08  Chelan River Project Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
10/02/08  Traditional Cultural Properties Management Plan (second request for extension of time granted by FERC)   Article 401 
09/30/08  2008 3rd Quarterly Daily Flow Report   Article 405 
09/30/08  2008 3rd Quarterly Hourly Report   Article 405 
09/24/08  Chelan Ranger District Large Fire History 2000-2007   Tributary Barriers 
09/23/08  2008 Archaeological Monitoring Survey (prepared by Cultural Resource Consultants)   Article 401 
09/15/08  Traditional Cultural Properties Management Plan (request for second extension of time submittal to FERC)   Article 401 
09/12/08  Chelan River Project Montly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project Montly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project Montly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
09/02/08  Riverwalk Loop Trail Extension (order granting time extension for construction from FERC)   Riverwalk Loop Trail Extension 
  Whitewater Boating (order granting time extension from FERC)   Article 407 
  Whitewater Boating (order granting time extension to conduct Whitewater Boating Study)   Whitewater Boating 
09/01/08  Stehekin River Kokanee Photographs (Washington State Department of Fish and Wildlife)   Monitoring and Evaluation Activities 
08/21/08  Reach 1 Trail (authorization to begin construction granted from FERC)   Reach 1 Access Trail 
08/15/08  Chelan River Project Monthly Report (submittal to FERC)   Low Level Outlet 
  Chelan River Project Monthly Report (submittal to FERC)   Pump Station Design 
  Chelan River Project Monthly Report (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
07/28/08  Little Creek Photos   Tributary Barriers 
06/30/08  2008 2nd Quarterly Daily Flow Report   Article 405 
06/30/08  2008 2nd Quarterly Hourly Flow Report   Article 405 
06/02/08  Reach 1 Access Trail Contract Plans (request for approval of contract plans sent to FERC)   Reach 1 Access Trail 
  Riverwalk Loop Trail Extension (request for specifications and revised construction schedule submitted to FERC)   Riverwalk Loop Trail Extension 
  Whitewater Boating (revised schedule request regarding Whitewater Boating Monitoring Study)   Whitewater Boating 
  Whitewater Boating (submittal of revised schedule to FERC)   Article 407 
05/29/08  2008 Preliminary Testing Recommendations (prepared by Cultural Resource Consultants)   Article 401 
05/28/08  Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (approval from Dept of Ecology)   Low Level Outlet 
  Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (approval from Dept of Ecology)   Pump Station Design 
  Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (approval from Dept of Ecology)   Reach 4/Tailrace Habitat Enhancement 
05/27/08  2008 Archaeological Monitoring Summary (prepared by Cultural Resource Consultants)   Article 401 
05/27/08  Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (submittal to Dept of Ecology)   Low Level Outlet 
  Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (submittal to Dept of Ecology)   Pump Station Design 
  Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP) (submittal to Dept of Ecology)   Reach 4/Tailrace Habitat Enhancement 
05/22/08  Water Quality Protection Plan   Low Level Outlet 
  Water Quality Protection Plan   Pump Station Design 
  Water Quality Protection Plan   Reach 4/Tailrace Habitat Enhancement 
05/06/08  Stehekin Area Implementation Monitoring Plan (order modifying and approval from FERC)   Article 403 
05/02/08  2008 1st Quarterly Daily Flow Report   Article 405 
05/02/08  2008 1st Quarterly Hourly Flow Report   Article 405 
04/28/08  2008 Annual Work Plan (acknowledgement of receipt from FERC)   Article 404 
04/17/08  2008 Annual Work Plan (submittal to FERC 2008)   Article 404 
  2008 Fish Stocking Report (submittal to FERC)   Article 404 
04/16/08  2007 Annual Flow Report (acknowledgement of receipt from FERC)   Article 405 
04/14/08  Recreation Resources Management and Implementation Plan (approval from FERC)   Article 407 
04/10/08  Wildlife Habitat Plan (modifying and approval from FERC)   Article 406 
03/20/08  Chelan River Projects (time extension granted from FERC)   Article 408 
  Chelan River Projects (time extension granted from FERC)   Low Level Outlet 
  Chelan River Projects (time extension granted from FERC)   Pump Station Design 
  Chelan River Projects (time extension granted from FERC)   Reach 4/Tailrace Habitat Enhancement 
03/01/08  2008 Tributary Barriers Photographs   Tributary Barriers 
03/01/08  Archaeological Sites and Resources Monitoring Plan (prepared by Cultural Resources Consultants)   Article 401 
02/28/08  2007 Annual Flow Report (submittal to FERC)   Article 405 
02/28/08  2007 Annual Flow Report Hourly Data   Article 405 
02/27/08  2007 Annual Implementation and Monitoring Report (acknowledgement of receipt from FERC)   Article 408 
02/12/08  Chelan River Projects (time extension request to FERC)   Article 405 
  Chelan River Projects (time extension request to FERC)   Article 408 
  Chelan River Projects (time extension request to FERC)   Low Level Outlet 
  Chelan River Projects (time extension request to FERC)   Pump Station Design 
  Chelan River Projects (time extension request to FERC)   Reach 4/Tailrace Habitat Enhancement 
01/31/08  2007 Annual Implementation and Monitoring Report (submittal to FERC)   Article 408 
01/01/08  100% Design Report   Reach 4/Tailrace Habitat Enhancement 
12/14/07  Erosion Control Implementation Plan (approval from FERC)   Article 401 
12/05/07  2007 Annual Report of Cultural Activities (submittal letter to FERC)   Article 410 
12/04/07  Lake Chelan Fishery Plan (order modifying and approval from FERC)   Article 404 
11/30/07  90% Design Drawings (submittal to FERC)   Low Level Outlet 
  90% Design Drawings (submittal to FERC)   Pump Station Design 
  90% Design Drawings (submittal to FERC)   Reach 4/Tailrace Habitat Enhancement 
11/30/07  Operations Compliance Monitoring Plan (order modifying and approval from FERC)   Article 405 
11/30/07  Quality Assurance Project Plan (order modifying and approval from FERC)   Article 401 
11/28/07  Threatened and Endangered Species Protection Plan (approval from FERC)   Article 408 
11/27/07  2007 Annual Lake Level Report (acknowledgement of receipt from FERC)   Article 405 
11/06/07  2007 Annual Lake Level Report (submittal to FERC)   Article 405 
11/06/07  Erosion Control Implementation Plan (submittal to FERC)   Article 401 
11/06/07  Erosion Control Monitoring and Maintenance Plan (submittal to FERC)   Article 401 
11/06/07  Lake Chelan Fishery Plan (submittal to FERC)   Article 404 
11/06/07  Reach 1 Access Trail (drawing)   Reach 1 Access Trail 
11/06/07  Recreation Resources Management and Implementation Plan (submittal to FERC)   Article 407 
11/06/07  Riverwalk Loop Trail Extension (drawing)   Riverwalk Loop Trail Extension 
11/06/07  Site Specific Erosion Control Plan (Sites 11, 55, 58, and 59) (submittal to FERC)   Article 401 
11/06/07  Stehekin Area Implementation Monitoring Plan (submittal to FERC)   Article 403 
11/06/07  Wildlife Habitat Plan (submittal to FERC)   Article 406 
09/28/07  90% Design Drawings   Reach 4/Tailrace Habitat Enhancement 
09/18/07  Chelan River Whitewater Boating Monitoring Study Plan   Article 407 
09/14/07  Traditional Cultural Properties Management Plan (time extension granted by FERC)   Article 401 
09/04/07  Bruce Heiner Habitat Photos   Reach 4/Tailrace Habitat Enhancement 
08/15/07  TEE Screen (submittal drawings to FERC)   Pump Station Design 
08/01/07  Traditional Cultural Properties Management Plan (time extension submittal to FERC)   Article 401 
07/30/07  60% Design Drawings   Reach 4/Tailrace Habitat Enhancement 
07/30/07  60% Design Site Construction Specifications   Reach 4/Tailrace Habitat Enhancement 
06/05/07  Reservoir Drawdown Limitation and Saftety Report (acknowledgement of receipt from FERC)   Article 302 
05/16/07  Lake Chelan Food Web Model Presentation (Washington Cooperative Fish and Wildlife Research Unit)   Lake Chelan Food Web Model 
05/04/07  30% Design   Reach 4/Tailrace Habitat Enhancement 
05/04/07  30% Report   Reach 4/Tailrace Habitat Enhancement 
05/04/07  Findings Report   Pump Station Design 
05/04/07  Operations Compliance Monitoring Plan (submittal to FERC)   Article 405 
05/04/07  Pump Procurement Drawings   Pump Station Design 
05/04/07  Pump Procurement Specifications   Pump Station Design 
05/04/07  Quality Assurance Project Plan (submittal to FERC)   Article 401 
05/04/07  Technical Specifications   Pump Station Design 
05/04/07  Threatened and Endangered Species Protection Plan (submittal to FERC)   Article 408 
05/01/07  Chelan River Riparian Planting   Reach 4/Tailrace Habitat Enhancement 
01/05/07  Reservoir Drawdown Limitation and Safety Report (submittal to FERC)   Article 302 
06/06/05  Study Results   Water Temperature Profile Study 
  Water Temperature Profile Study (Study Results)    
07/23/04  Study Plan   Water Temperature Profile Study 
12/30/03  Chelan River Spill Exceedence 1974-2003   Low Level Outlet