Licensing and Compliance
Studies/Reports
Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP), May 27, 2008
Water Quality Protection Plan, May 22, 2008
90% Design Drawing Submittal to FERC, November 30, 2007
Tee Screen Submittal Drawing, August 15, 2007
30% Design Report, May 4, 2007
30% Drawings, May 4, 2007
Erosion and Sediment Control Plan, May 4, 2007
Findings Report, May 4, 2007
Pump Procurement Drawings, May 4, 2007
Pump Procurement Specs, May 4, 2007
Technical Specs, May 4, 2007
90% Design Drawings Submittal to FERC, November 30, 2007
90% Design Drawings, September 2007
Chelan River Riparian Planting, May 2007
Chelan River Spill Exceedence 1974 - 2003
60% Design Report, July 2007
60% Design Drawings, July 30, 2007
60% Design Site Construction Specifications, July 2007
Bruce Heiner Habitat 1 Photo
Bruce Heiner Habitat 2 Photo
Bruce Heiner Habitat 3 Photo
Bruce Heiner Habitat 4 Photo
90% Design Drawings Submittal to FERC, November 30, 2007
30% Design Report, May 4, 2007
(Contact Jeff Osborn at 509 661-4176 regarding CEII documents)
Study Results, June 6, 2005
Study Plan, July 23, 2004
FERC approval, November 30, 2007
FERC submittal, May 4, 2007
FERC approval, November 28, 2007
FERC submittal, May 4, 2007