Licensing and Compliance

Studies/Reports


Chelan River Projects 
* Water Quality Protection Plan

     Storm Water Pollution Prevention Plan (SWPPP) and Erosion Soil Control Plan (ESCP), May 27, 2008
     Water Quality Protection Plan, May 22, 2008

* Pump Station Design   

     90% Design Drawing Submittal to FERC, November 30, 2007 
     Tee Screen Submittal Drawing, August 15, 2007
     30% Design Report, May 4, 2007
     30% Drawings, May 4, 2007
     Erosion and Sediment Control Plan, May 4, 2007
     Findings Report, May 4, 2007
     Pump Procurement Drawings, May 4, 2007
     Pump Procurement Specs, May 4, 2007
     Technical Specs, May 4, 2007

* Reach 4/Tailrace Habitat Enhancement

     90% Design Drawings Submittal to FERC, November 30, 2007         
     90% Design Drawings, September 2007
     Chelan River Riparian Planting, May 2007
     Chelan River Spill Exceedence 1974 - 2003
     60% Design Report, July 2007
     60% Design Drawings, July 30, 2007
     60% Design Site Construction Specifications, July 2007
     Bruce Heiner Habitat 1 Photo
     Bruce Heiner Habitat 2 Photo
     Bruce Heiner Habitat 3 Photo
     Bruce Heiner Habitat 4 Photo

* Low Level Outlet Design

     90% Design Drawings Submittal to FERC, November 30, 2007
     30% Design Report, May 4, 2007
     (Contact Jeff Osborn at 509 661-4176 regarding CEII documents)

Water Temperature Profile Study

     Study Results, June 6, 2005
     Study Plan, July 23, 2004

Operations Compliance Monitoring Plan

     FERC approval, November 30, 2007
     FERC submittal, May 4, 2007

Threatened and Endangered Species Protection Plan

     FERC approval, November 28, 2007
     FERC submittal, May 4, 2007