Licensing and Compliance

CRFF 2004 Meetings

Meeting History

January 16, 2004
(CRFF) Forum - Purpose is to have a kick-off meeting with forum and consultant to discuss the habitat modifications in Reach 4 and tailrace.
January 26, 2004
(CRFF) Forum - Purpose is to visit Reach 4 and tailrace areas with forum and consultants and discuss the habitat modifications in Reach 4 and tailrace, and design alternatives for pump station in Reach 4 for the Lake Chelan Project.  (Meet at Powerhouse Park at 10 a.m.)
May 6, 2004
(CRFF) Forum - Purpose is for consultants to present the forum preliminary designs for the habitat modifications in Reach 4 and tailrace, pump station in Reach 4,and low level outlet structure at the Chelan dam.
June 22, 2004
(CRFF) Forum - Purpose is for consultants to present the forum preliminary designs for the habitat modifications in Reach 4 and tailrace, pump station in Reach 4, and low level outlet structure at the Chelan dam.
August 16, 2004
(CRFF) Forum - Review and discuss feasibility/conceptual designs associated with habitat modifications in Reach 4 and tailrace.